TUNNEL POWDER COATING OVEN

Min. Order: 1 Piece/Pieces
Payment Terms: T/T
Supply Ability: 200Piece/Pieces Per Month
Place of Origin: Zhejiang

Company Profile

Location: Hangzhou, Zhejiang, China (Mainland)
Business Type: Manufacturer, Distributor/Wholesaler

Product Detail

Model No.: COLO-O
Means of Transport: Ocean
Brand Name: colo
type: Coating Spray Gun
weight: 2000kgs
kind: one-touch intelligent
Dimension(L*W*H): L3*W2.2*H1.8(m)
Material / Metal: Steel,all metallic surface
Voltage: 220v/110v
Power(W): 1.5KW
Certification: CE/ISO
After-sales Service Provided: Overseas service center available
Warranty: 1 YEAR
Production Capacity: 200Piece/Pieces Per Month
Packing: wood box or carton box
Delivery Date: 15 days
Show

Product Description

TUNNEL POWDER COATING OVENTUNNEL POWDER COATING OVENTUNNEL POWDER COATING OVEN
1,Full automatic control
2,Small area occupation
3,Low energy consumption
4,customize

TUNNEL POWDER COATING OVEN Powder Coating Ovens with Overhead Conveyor used for curing the workpiece which has been spraying during the powdercoating. When a thermoset powder is exposed to elevated temperature, itbegins to melt, flows out, and then chemically reacts to form a highermolecular weight polymer in a network-like structure.

Powder coating oven have a galvanized steel sheet on outside and steel sheet on the inside.

  • Structure:consist of Body,insulation, cover, heater(stainless steel heater withHeat Sink).use electricity to create the energy ,through the circulating fan ,make the temperature in the oven to rise uniformly. Then make the temperature of workpiece to rise.

along with a built-in track to roll your powder coating racks into the ovens.



A, make sure the ground is level.

B, clean the inner of the oven, close the door.

C,make the workpieces which will to be cure ready. About half an hour.

D, Set the temperature as you required, normally for 180°C-200°C.set the time you need to cure, such as 25 minutes (this will accordingto thickness of your workpiece, if for thin,then 20mins,for thicknessabout 25mins).open the door, push the workpieces into the oven,close thedoor.

E, turn on the power switch,and then press the bottom of turn on

F,After the temperature reach to the value we setted, the time will beginto change.(you don't need to operate, it is automatic change )

G, When hear the bell ring, press the bottom of turn off ,push out the workpiece which has been cured. Push into the next batch.

H, please lift down the the workpiece which from the oven after cured ,after it will be cooled.

We provide stock or custom-built powder coating ovens.

All oven dimensions are interior

There is a one-year warranty on all electrical componets

Please allow us 2-3 weeks to build after you placing order.

Post Buying Request