user login

Industrial Tunnel Powder Coating Drying Oven

9999.0 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB,CFR,CIF
Payment Terms: T/T, WU, Money Gram
Supply Ability: 200pcs/month
Place of Origin: Zhejiang

Company Profile

Location: Hangzhou, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company, Service

Product Detail

Model No.: FF-O-T4
Means of Transport: Ocean
Brand name: FeiFu
Place of Origin: Zhejiang,China
Oven Dimension(L*W*H): As per design
Heating energy: Gas
Using time: more than 10 years
Certification: ISO9001/CE
Burner: Italy Riello
Warm-up time: 15-30 min.
Warm-up temperature: 180-220°C
Warranty: 1Year,12 months
Production Capacity: 200pcs/month
Packing: Container
Delivery Date: As per your order
Show

Product Description

Industrial Tunnel Powder Coating Curing Oven

This powder coating oven is used to curing the workpiece which has been spraying during the powder coating. When a thermoset powder is exposed to elevated temperature, it begins to melt, flows out, and then chemically reacts to form a higher molecular weight polymer in a network-like structure.

Powder coating oven have a galvanized steel sheet on outside and steel sheet on the inside.

  • Structure: consist of Body, insulation, cover, heater(stainless steel heater with Heat Sink).use electricity to create the energy ,through the circulating fan ,make the temperature in the oven to rise uniformly. Then make the temperature of workpiece to rise.

  • along with a built-in track to roll your powder coating racks into the ovens.

  •  

    Installation and operation

    A, make sure the ground is level.

    B, clean the inner of the oven, close the door.

    C, make the workpieces which will to be cure ready. 20~30 min

    D, Set the temperature as you required, normally for 180°C-200°C. set the time you need to cure, such as 25 minutes (this will according to thickness of your workpiece, if for thin,then 20mins,for thickness about 25mins).open the door, push the workpieces into the oven, close the door.

    E, turn on the power switch,and then press the bottom of turn on

    F, After the temperature reach to the value we setted, the time will begin to change.(you don't need to operate, it is automatic change )

    G, When hear the bell ring, press the bottom of turn off ,push out the workpiece which has been cured. Push into the next batch.

    H, please lift down the the workpiece which from the oven after cured ,after it will be cooled.

    We provide stock or custom-built powder coating ovens.

    All oven dimensions are interior

    There is a one-year warranty on all electrical componets

    Please allow us 2-3 weeks to build after you placing order.

     

     This equipment, all kinds of size can be available that the size depending on the size of workpiece and how many workpieces you will spray in a day.


     

Post Buying Request