Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | Paypal, T/T, WU |
Supply Ability: | 20sets per year |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean, Land |
---|---|
Brand Name: | COLO |
Inner Material: | t1.0mm galvanized plate |
Outter material: | t0.5mm galvanized plate |
Thickness Insulation: | 120mm |
Warm-up time: | 15 min. (180-220° C) |
Homogeneity: | < ± 3°C if 185°C |
Temperature stability: | < ± 1°C |
Temperature max: | 250° C |
Power supply: | 13.5KW |
Production Capacity: | 20sets per year |
Packing: | wooden box |
Delivery Date: | 30days |
Tunnel ovens are designed for continuous operations.
The powder coated products painted in automatic facilities are constantly processed in the tunnel
ovens under desired temperature and time.
These type ovens are manufactured in various types depending on area to be installed and
conveyor speed (as U-turn, S type or M type).
Maximum painting efficiency is obtained with high capacities by means of those systems.
Heating type:Gas/LPG/Diesel/Infared etc.can be chose.
1.The drawing as a renference.
2.Drying &curing tunnel oven.size can be ordered.
inner Size | L14x W1.8x H3.2m |
L14x W(3.3-4.3)x H3.2m | |
Rock warm board | 100mm |
edge SPGCC | t=1.5mm |
bottom structure | 10# square tube |
Body structure | 8# square tube |
Burner of drying | 200,000 Kcal ,1pcs (Riello) |
Burner of curing | 400,000 Kcal ,1 pcs (Riello) |
fan motor | 5.5KW ,1pcs |
7.5kw 1pcs |
3.Applications:
Powder coating paint use all kinds of the metallic surface products, will have the best
finishing work of your workpieces , like furniture, LPG tank, car wheels, motocycle frame,
garden fencing....
4.Customer visit
5.FAQ
If you need a quotation about a powder coating plant, then we can help you ,first we need
some informations like below.
1.Do you need a automatic line or semi auto coating line???
2.how big your factory? length, width, and hight??
3.what is size of your biggest workpiece , length and width, and weight??
4.which energy do you want to use for heating oven?? electric, gas or LPG??
5.The most imporant what's the production you prefer to realize after using new line?? (8hours)
6.how many color you need change every day?? (8 hours)