user login

progression stamping tool die suppliers in China

10000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CIF,EXW
Payment Terms: Paypal, L/C, T/T, WU, Money Gram
Supply Ability: 300sets
Place of Origin: Guangdong

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: 555645564
Means of Transport: Ocean, Air, Land
Product: Vehicle Mould
Product Material: Metal
Shaping Mode: Punching Mold
Brand Name: KK
Mould material: P20
Design software: Auto CAD
Surface treatment: TD
Mould life: 100000-3000000times
Production Capacity: 300sets
Packing: plastic film + Wooden Boxes
Delivery Date: 30-60days
Show

Product Description

Product Description

 

Product Name

progression stamping tool die suppliers in China



Material of Die

D2, SKH-9, SKD11, A3,SKD61 etc.

Design Software

AutoCAD, PRO/E, UG

Die Type

Stamping Press moulds, transfer die, stamping die, punching die, sheet metal Mould,progressive Die,terminal die,single die, double die or according to your parts

Drawing format

Igs,stp, prt, asm, pdf, dwg, dxf

Die Life

1,000,000-3,000,000 shots

First Trial

15-30 days after mold drawing confirmed

 

 

Our Services

 

 all life after sale service, warranty of progressive die: 100000 to 3000000 times punches

1. OEM / ODM services available

2. A full series of services offered from design to manufacture.

3. Mold processing photos sent weekly to you in production period.

4. Mold test report and parts measuring report provided to you.

 

5. Samples for your confirmation and improvement made as you required.

Company Information

 

K & K Tool & Die Co.,Ltd. Is an independent manufacturer of Stamping tool for the global automotive industry. with 8 years of Experience, we are concentrating our efforts on quality, cost and On-time delivery, allowing the customers to focus more on innovation and Sales. We pride ourself on combining the synergies of advanced Engineering, manufacturing expertise and financial strength to offer Customers stamping tools with unparalleled quality, to generate value For customers.

FAQ

 what is the payment method?

 

 30% down payment, 30% after structure design confirmed, the balance should be paid before shipment

 

What is the sample delivery date?

 

30 days usual after structure confirmed.

 

More pictures for your reference:

Post Buying Request