Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CIF,EXW |
Payment Terms: | Paypal, L/C, T/T, WU, Money Gram |
Supply Ability: | 300sets |
Place of Origin: | Guangdong |
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | 555645564 |
---|---|
Means of Transport: | Ocean, Air, Land |
Product: | Vehicle Mould |
Product Material: | Metal |
Shaping Mode: | Punching Mold |
Brand Name: | KK |
Mould material: | P20 |
Design software: | Auto CAD |
Surface treatment: | TD |
Mould life: | 100000-3000000times |
Production Capacity: | 300sets |
Packing: | plastic film + Wooden Boxes |
Delivery Date: | 30-60days |
Product Description
Product Name | progression stamping tool die suppliers in China |
Material of Die | D2, SKH-9, SKD11, A3,SKD61 etc. |
Design Software | AutoCAD, PRO/E, UG |
Die Type | Stamping Press moulds, transfer die, stamping die, punching die, sheet metal Mould,progressive Die,terminal die,single die, double die or according to your parts |
Drawing format | Igs,stp, prt, asm, pdf, dwg, dxf |
Die Life | 1,000,000-3,000,000 shots |
First Trial | 15-30 days after mold drawing confirmed |
Our Services
all life after sale service, warranty of progressive die: 100000 to 3000000 times punches
1. OEM / ODM services available
2. A full series of services offered from design to manufacture.
3. Mold processing photos sent weekly to you in production period.
4. Mold test report and parts measuring report provided to you.
5. Samples for your confirmation and improvement made as you required.
Company Information
K & K Tool & Die Co.,Ltd. Is an independent manufacturer of Stamping tool for the global automotive industry. with 8 years of Experience, we are concentrating our efforts on quality, cost and On-time delivery, allowing the customers to focus more on innovation and Sales. We pride ourself on combining the synergies of advanced Engineering, manufacturing expertise and financial strength to offer Customers stamping tools with unparalleled quality, to generate value For customers.
FAQ
what is the payment method?
30% down payment, 30% after structure design confirmed, the balance should be paid before shipment
What is the sample delivery date?
30 days usual after structure confirmed.
More pictures for your reference: