Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 20 |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | ST0098 |
---|---|
Means of Transport: | Ocean, UPS, Air, Land |
Product: | Household Appliance |
Product Material: | Aluminium |
Shaping Mode: | Die Casting |
Brand Name: | Sunrise Metal |
Die Casting Method: | Pressure die casting |
Machining: | Machining Center |
Surface preparation: | Deburring |
Cavity material: | H13 |
Tooling lead time: | 4~6weeks |
Maintance tooling: | in house |
Tooling life: | 50~60K shots |
Tooling Frame material: | #45 steel |
Capability: | 20~25sets/month |
Production Capacity: | 20 |
Packing: | wood carton |
Delivery Date: | 4~6weeks |
Die Casting Method: Precision Die Casting
Machining: Machining Center
Surface Preparation: Deburring
Tolerance Grade(to general products): ±0.05mm
Certification: SGS, ISO 9001:2008,TS16949
Size: Customized
Mold: Mold Design & Making
Material Available: ADC10, ADC12, A380, A360, A390 AlSi12,etc.
Transport Package: Carton or Bubble Wrap, pallet or as customers' requirement
Origin: Kunshan, Suzhou P.R. China
Die Casting Machine Type: High pressure Cold Chamber Die Casting Machine
Application: all kinds of Hardware
Material: Aluminum Alloy
OEM/ODM: Available/warmly welcomed
Software Applied: PRO/E, Auto CAD, Solid Work 2008, Ug, CAD
Trademark: Sunrise or Customized
HS Code: 7616991090
Work method
1.When we get customer's drawings, our engineer firstly evaluate whether can be produced by die casting process, if yes, we will carefully study the drawing and advise some suggestion to be easily form via DFM(design for manufacture), we will mark the location of the fixed mold,moved mold, gate,slide, parting line,overflows,ejector pins,air vents,runner etc.
2.We will discuss with customer about the DFM, and try our best to make the good parts used the best price. For the mold, it's frame and big, so it's easy to deform, so we will discuss with customer the flatness requirements,then we can design the tooling, we will per the flatness requirement to make the good tooling to satisfy it.
3.Customer confirmed our DFM, we will send the Tooling making schedule to customer, and every week we will track the tooling schedule and send to customer and tell customer we are on the schedule, no problem. If some issue need to delay, we will send the email to customer and explain the delay reason in advance.
4.Usually we make the tooling, will take around 30~45 days, when we finish it, we will trial run to verify the tooling, if no problem, we will send the samples to customer to approve the parts and tooling.
5.Every part have its different tooling, when we finish the tooling, we will summary the tooling to better design next tooling