Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,EXW |
Payment Terms: | L/C, T/T, WU, Money Gram |
Supply Ability: | 1PCS/month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Service |
Model No.: | FF-L-MONO |
---|---|
Means of Transport: | Ocean |
Brand name: | FeiFu |
Line type: | horizontal |
product: | mental products |
working voltage: | as request |
control system: | PLC |
warranty: | 1 year |
Certification: | CE |
Powder coating: | automatic |
Series: | powder coating equipment line |
GUN: | automatic powder coating gun |
Production Capacity: | 1PCS/month |
Packing: | container |
Delivery Date: | 45-60days |
mono cyclone powder coating line
Advantages and characteristics
Our company has rich practice experience of turnkey powder coating line which is from designing, processing, auxiliary equipment, installation and commissioning. We have finished more than hundreds of projects. Under many years effort, our company has won customers trust and support, and meanwhile we have a lot of excellent experienced personnel of design, manufacturing, and installation.
Powder coating line include:
Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment
Conveying system: closed-circuit conveyor, power and free conveyor, multi-track conveyor, and so on
Oven: batch oven, combination oven, bridge curing oven, tunnel oven
Powder coating booth: stainless steel booth or coated steel booth
Powder recycling facility: mono-cyclone pulse recovery system or multi-cyclone pulse recovery system or pulse recovery system
Control system: PLC control, with or without touch screen
Spray gun and reciprocator: FeiFu brand, or other brands with same level performance.
Here is the real picture of powder coating line for your reference
If you want to ask a quotation about the powder coating line. Please show us this information.
1. The size of workpiece,especially the max size, and the weight.
2. Is there any requirements about the suspension of the workpiece?
3. How many pcs you want coating in 8 hours?
4. The length,width and height of the factory available for the powder coating line
5. The heating power:Liquefied Petroleum Gas, Liquefied natural gas,diesel,or electric?
6. How many colors do you have in total?
7. You need automatic painting or manual painting?
8. Do you need pre-treatment process? If you do,you like spray pre-treatment or bath pre-treatment?