user login

steel slag in concrete equipment

100000.0 USD
Min. Order: 1 Set/Sets
Supply Ability: 21-210 t/h
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: GRM
Means of Transport: Ocean
Brand Name: chaeng
Annual Output: 0.2 --1.5 million tons
Blaine Fineness: 4200-4500 cm²/g
Power Consumption: 5-45 kWh/t
Matching equipment: Feed belt +Vibrating screen+Nickel slag vertical mill+hot blast stove+dust collector+warehouse
Production Capacity: 21-210 t/h
Packing: The main machinery is in nude packing
Delivery Date: within 30days after your payment
Show

Product Description

Annual Output : 0.2 --1.5 million tons

Blaine Fineness : 4200-4500 cm²/g

Power Consumption : 35-45 kWh/t

Matching equipment : Feed belt +Vibrating screen+Nickel slag vertical mill+hot blast stove+dust collector+warehouse

CHAENG (Great Wall Machinery) can undertake 20 tons --1.5 million tons of Nickel slag grinding plant EPC projects.We can provide EPC- turnkey service including raw material testing, engineering design, equipment manufacturing, installation & commissioning, operation training and finally achieves the designing capacity and production standard. Our company can provide the service from the proposal designing to the plant running to meet your integrated purchase requirement. Select the CHAENG, to provide you with one-stop service that truly allows you to save time and effort!

steel slag in concrete equipment

Process Description

Forklift will transfer the nickel slag from the slag pile to the weighting silo.

During the transportation, the slag will be magnetized and sieved to remove the iron parts.

The pre-processed slag then will be fed to the vertical mill by the elevator for grinding.

After grinding, the slag will be classified and dried by the hot air generator.

The required nickel powder then will be collected by the dust collector and transferred to the final product ware house by air delivery chute and elevator.

Project Case

CHAENG signed the turn-key project of 300,000 tons annual nickel slag grinding production line with Growth Steel Group (Indonesia) on November 2015. This production line is the modified turnkey project with version 2.0 with GRMSS33.31 vertical mill. Currently, this project has finished design, foundation construction and equipment manufacturing,

and soon we will finish the installation, commissioning and this project supposed to start running on July, 2016.


Post Buying Request