user login

Concrete bridge deck pothole repair

1800.0 USD
Min. Order: 5 Ton
Payment Terms: L/C, T/T, WU
Supply Ability: 1000 tons / month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution

Product Detail

Model No.: QM
Means of Transport: Ocean
Brand Name: HUINENG
Usage: repair bridge deck pothole
Speed: 1 hour restore traffic
Color: Grey
Setting time: Initial setting:25mins Final setting:35mins
Flexural strength: 5.5Mpa/2 hours
Compressive strength: 33Mpa/2 hours
Pulling strength: 2.8Mpa
Expansion rate: 0.01%
Certificate: ISO9001:2008
Inspection report: MSDS
Production Capacity: 1000 tons / month
Packing: Paper plastic composite bag packaging, 25Kg/bag.
Delivery Date: Within 7 working days
Show

Product Description

                Concrete bridge deck pothole repair 


concrete pothole in bridge deck:

As for concrete bridge deck pothole repair, we provide fast, professional service utilizing amazing new technology designed to save your time and money! it is a kind of single

component special repair material. mainly repair for bridge deck pothole,achieved 1h open to traffic. 


Technical data of concrete bridge deck pothole repair:

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time

Initial setting

Min

≥20

  25

Meet requirement

Final setting 

≤60

  35

Compressive strength

2h

Mpa

≥20

  33.0

Meet requirement

1d

≥40

  66.1

28d

≥50

  90.5

Flexural strength

2h


     ≥4

  5.5

Meet requirement

1d

     ≥6

  10.5

28d

     ≥8

  13.5

Pulling strength

28d

Mpa

     ≥2.0

   2.8

Meet requirement

Expansion rate

28d

 /

0.00%-0.1%

   0.01%

Meet requirement

Core advantage of concrete bridge deck pothole repair:

  • 1H open to trafffic:Fast setting.rapid repair bridge deck pothole.

  • Bonding tightly:No break and fall off from normal concrete.

  • High compressive strength,1d≥60Mpa, 28d≥80Mpa,

  • Good toughess: Impact resistance strength is 8-10 times of normal concrete 

  • No drying cracks in new and old adhesion area.

  • Heat expansion and cold contraction is nearly same as original concrete.

  • Color of repaired area is close to original concrete. 

Concrete bridge deck pothole repair way:

Step 1: Joint-cutting

Step 2: Chiseling 

Step 3: Wash and Clean 

Step 4: Mix QM repair material with water 

Step 5: Pour mixed repair material to pothole

Step 6: Open to traffic 


If you need repair concrete bridge deck pothole, pls contact us quickly. Time and Money can be saved for you.



Post Buying Request