user login

Concrete sugaring repair mortar made in China

1000.0~1800.0 USD
Min. Order: 5 Ton
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 1000 tons one month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution

Product Detail

Model No.: BC
Means of Transport: Ocean
Brand Name: HUINENG
Minimum passing time: 2 hours
Adhesive properties: Strong viscosity
Durability: Waterproof, corrosion-resistant
Compression performance: More than 50Mpa
Certificate: Sira/SGS
Color: Grey
Deliver time: In one week
QQ: 1660135199
Emial: lovelyfunnyhelen@gmail.com
Production Capacity: 1000 tons one month
Packing: 25kg/ bag
Delivery Date: In one week
Show

Product Description

BC type concrete road repair material is high technology product, which is of thin layer repairing concrete road surface dusting, peeling, exposed stone etc diseases. And achieved 2h open to traffic.surface disease(dusting,peeling,honeycomb,surface fracture,polygonal ground)

One. Application Range

Professional repair concrete surface diseases of various grades roads, airports, squares, parking lots, gas stations, factory floors and room floors etc. Such as: peeling, dusting, surface angularity, freeze thawing, slat corrosion, honeycombs, pitting, cracking etc. It can achieve 2mm ultra-thin repair on heavy load and high flow concrete road. It don't fall off and break under the force of stretching, rolling, moving and shaking, also stable performance and long service life. 

Two. Core Advantages

1. Fast early strength, 2h can restore traffic.

2. Thin layer repair 2-3mm, don't break and fall off.

3. High adhesion,compression,flexural strength.

4. Abrasive resistance is 8-10 times of normal concrete.

5. Waterproof, anti-freeze and hydrochloric acid corrosion resistance.

6.Beautiful, Small color difference with original road surface.

Three.Performance Parameter

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time 

Initial setting

Min

≥15

25

Meet requirement

Final setting 

≤60

35

Compressive strength

2h

Mpa

≥20

32

Meet requirement 

1d

≥30

63

28d

≥50

95

Pulling strength

28d

Mpa

≥1.0

2.8

Meet requirement 

Expansion rate

28d

/

0.0%-0.1%

0.02%

Meet requirement

 Four. Repair process

Identifying→Cleaning→Washing→Wetting→Cleaning→Adding water→Mixing→Paving→Curing→Joint-cutting

Identifying: Select area need to be repaired. 

Cleaning:Clean out crushed stone, dust etc cleanly within area need to be repaired by high pressure blower gun.

Washing:rush mud out from operation surface when wash. And prevent backflow.

Wetting: After wash cleanly by water,it should keep water in operation surface for a period time. 

Cleaning: Clean water out from operation surface by high pressure blower gun.

Adding water: Mix material and water then stir, the effect is best when water added 17%-18%.

Mixing: It must fully stir evenly by vertical mixer

Paving:Pour mixed repair material to operation surface need repair, flattening by darby immediately.

Five. Notes

1.Construction time should be controled in 15 minites after mixing the material to prevent the material harding, because it is rapid setting.

2.The harding material can not be used again.

 

Post Buying Request