user login

PEF150X750 ore jaw crusher

1000.0~200000.0 USD
Min. Order: 1 Set/Sets
Payment Terms: L/C, D/P, T/T, WU
Supply Ability: 30per month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer
Main Products: Jaw Crusher, PE Jaw Crusher, PEF Jaw Crusher

Product Detail

Model No.: PEF150X750
Means of Transport: Ocean
Application: Ore
Type: Crusher
Brand Name: Dingke
Production Capacity: 30per month
Packing: export standard
Delivery Date: 2days
Show

Product Description

Operating principle of Dingke Impact crusher:
Impact Crusher is a kind of crushing equipment which uses impact energy to crush maters.When getting into the effective area of hammer plates,due to the high speed of striking,the raw materials are thrown onto the impact equipment which is installed above the rotor.Then the materials are rebounded to the effective area of hammer plates and crushed again in the crushing chamber.At last,when the particles reach to the proper size,they will be discharged from the bottom of the machine.

Application of Jaw Crusher:
he four stages of the design of the cement pad machine
cement pad machine is designed to meet the need of the block industry,realize a mechanical technology system brick process.To achieve this block equipment mechanical design can be divided into four stages:
1.planning stage
This stage includes through the block market research, according to the "social needs", analyze the market prospect, and according to the current development level of science and technology, develop the function of products, technical indicators, work out the design specification, carries on the project.
2.program desige stage
This stage is based on the tasks require that brickmaking requirements,prepared on the basis of the basic principle,achieve the requirements of the mechanical movement system solutions,Schematic drawing system the kinematic diagrams or work.
3.process desine stage
Mainly comprise the pad the device overall structure design and process design of two parts, at this stage all the technical information required to complete product manufacturing

4.Preparation of the technical information stage
Post Buying Request