user login

Boiler Air Distribution Plate

Min. Order: 1 Set/Sets
Payment Terms: L/C, T/T
Supply Ability: 100 Set/Sets per Year
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company, Agent, Distributor/Wholesaler, Service, Association, Other
Main Products: Waste Heat Boiler, Carbon Kiln Waste Heat Boiler, Boilers, Glass Kiln Waste Heat Boiler, Boiler

Product Detail

Means of Transport: Ocean
Fuel: Coal-fired
Output: Steam
Usage: Industrial
Structure: Water/fire Tube
Pressure: Low Pressure
Production Capacity: 100 Set/Sets per Year
Packing: standard export package
Delivery Date: 3 months
Show

Product Description

DZL6-1.25-AII (CNF USD)
NameSpecQtyUnit priceTotal
Boiler body-------------1 set4480044800
FD fanG6-41-11NO7.1AH=1910Pa Q=8100m3/h         N=7.5KW1 set900900
ID fanY6-41-11NO9C     H=3994Pa Q=20829m3/h       N=37KW1 set22002200
Reduction gearboxGL-10P      N=0.75Kw1 set18001800
Slag removerGBC-6       L=5m1 set13501350
EconomizerS-61 set33503350
Electricalcontrol boxGDK-6T1 set24502450
Water feedingpumpQDG8-14×17        Q=8m3/hH=238m               N=18.5Kw2 set13002600
Flue ductsQ235-ACarbon Steel1 set13001300
Valves &Instrument------------1 lot24002400
Coal feederTGS-61 set800800
WatertreatmentBM-61 set16001600
DividedCylinderFQ-500A     DN1501 set850850
Dust collectorXTD-6         Q=19200m3/h1 set21002100
Steam PumpQB-5          Q=15m3/h1 set800800
ChimneyQ235Carbon Steel       1 set22002200
Boiler Tot71500
Land FreightChargeTo Qingdao Seaport3000
Sea FreightChargeFR and Container8500
Total Price83000
Optional PartsThe equipments under this subject are notnecessary devices for boiler.
FrequencyControlControl Scope: ID & FDfan                   Inverter Brand: ABB Germany             45004500
Note:
1.The price is CNF DHAKA USD.
2. Payment terms: 30% dowmpayment, 70% by T/T or L/C at sight beforeshipment. but can be discussed.
3.Production time: within 45 days after receiving downpayment.
4.Sea freight charge alternative:  
      $ 8,500.00 (Boiler Body by One 40' FR, Boiler Auxiliaries by One 40' and One 20' GP)
5. The installation Fee:
    Theuser will afford the cost of the superviser in user country. For 6 ton boiler, we need to send 2 supervisers.
    The installation and testing period isabout 25-30 days.
    Thecustomer taker care of return tickets and supervieser charges and living costat sit. The salary for
    superviser is USD50.00 per day.
Post Buying Request