user login

Industrial Boiler Air Distribution Plate

Min. Order: 1 Set/Sets
Payment Terms: L/C, T/T
Supply Ability: 100 Set/Sets per Year
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company, Agent, Distributor/Wholesaler, Service, Association, Other
Main Products: Waste Heat Boiler, Carbon Kiln Waste Heat Boiler, Boilers, Glass Kiln Waste Heat Boiler, Boiler

Product Detail

Means of Transport: Ocean
Fuel: Coal-fired
Output: Steam
Usage: Industrial
Structure: Water/fire Tube
Pressure: Low Pressure
Production Capacity: 100 Set/Sets per Year
Packing: standard export package
Delivery Date: 3 months
Show

Product Description

 Industrial Boilers Air Distribution Plate
We by the abundant technical force, perfect detection means, strict quality management, sophisticated processing equipment, has its place in the same industry. Our company strictly abide by equality and mutual benefit, quality first, customer supreme principle, is willing to provide warm and thoughtful pre-sale service.
Our corporate culture: outstanding service quality, strict implementation of standards, the system composition, the consummation post-sale service.
Industrial Boilers Air Distribution Plate:
Output:Steam
Structure:Water/fire Tube
Fuel:Coal-fired
Usage:Industrial
Double Wings Gas Ducts structure. Ithas the features of small occupation, bigger output, quick pressure and high efficiency.
DZL6-1.25-AII (CNF USD)
NameSpecQtyUnit priceTotal
Boiler body-------------1 set4480044800
FD fanG6-41-11NO7.1AH=1910Pa Q=8100m3/h         N=7.5KW1 set900900
ID fanY6-41-11NO9C     H=3994Pa Q=20829m3/h       N=37KW1 set22002200
Reduction gearboxGL-10P      N=0.75Kw1 set18001800
Slag removerGBC-6       L=5m1 set13501350
EconomizerS-61 set33503350
Electricalcontrol boxGDK-6T1 set24502450
Water feedingpumpQDG8-14×17        Q=8m3/hH=238m               N=18.5Kw2 set13002600
Flue ductsQ235-ACarbon Steel1 set13001300
Valves &Instrument------------1 lot24002400
Coal feederTGS-61 set800800
WatertreatmentBM-61 set16001600
DividedCylinderFQ-500A     DN1501 set850850
Dust collectorXTD-6         Q=19200m3/h1 set21002100
Steam PumpQB-5          Q=15m3/h1 set800800
ChimneyQ235Carbon Steel       1 set22002200
Boiler Tot71500
Land FreightChargeTo Qingdao Seaport3000
Sea FreightChargeFR and Container8500
Total Price83000
Optional PartsThe equipments under this subject are notnecessary devices for boiler.
FrequencyControlControl Scope: ID & FDfan                   Inverter Brand: ABB Germany             45004500
Note:
1.The price is CNF DHAKA USD.
2. Payment terms: 30% dowmpayment, 70% by T/T or L/C at sight beforeshipment. but can be discussed.
3.Production time: within 45 days after receiving downpayment.
4.Sea freight charge alternative:  
      $ 8,500.00 (Boiler Body by One 40' FR, Boiler Auxiliaries by One 40' and One 20' GP)
5. The installation Fee:
    Theuser will afford the cost of the superviser in user country. For 6 ton boiler, we need to send 2 supervisers.
    The installation and testing period isabout 25-30 days.
    Thecustomer taker care of return tickets and supervieser charges and living costat sit. The salary for
    superviser is USD50.00 per day.
Industrial Boilers Air Distribution Plate:
Output:Steam
Structure:Water/fire Tube
Fuel:Coal-fired
Usage:Industrial
Output:Steam Structure:Water/fire Tube Fuel:Coal-fired Usage:Industrial Pressure:Low Pressure
Our corporate culture: outstanding service quality, strict implementation of standards, the system composition, the consummation post-sale service.


Post Buying Request