user login

Ndfeb magnet segment for brushless DC motor

Min. Order: 1000 Piece/Pieces
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T
Supply Ability: 10TON/MONTH
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer, Trading Company

Product Detail

Means of Transport: Ocean, Air, Land
Application: Industrial Magnet
Shape: Block
Type: Permanent
Composite: NdFeB Magnet
Brand Name: HONY
Application: Moto Magnet
Coating Thickness: 25-50
Working temperature: High up to 150℃
Coating: Black Epoxy
Production Capacity: 10TON/MONTH
Packing: CARTON
Delivery Date: 25
Show

Product Description

Ndfeb magnet segment for brushless DC motor

Specifications


Magnet segment: 

1. High size precision 

2. Complicated shape and muti-poles 

3. SST:48/72 hours 

4. Good corrosion-resistance


Ndfeb magnet segment for brushless DC motor

Ndfeb magnet segment for brushless DC motor

roduct nameNdfeb magnet segment for brushless DC motor
MaterialBonded Neodymium-Iron-Boron
GradeBN-6
CoatingBlack epoxy
ShapeArc
Dimensional Tolerance+/-0.05mm
Magnetization Direction4-Poles on OD
Temperature Range (Deg C)0 to 100
Remanence(Br)550-620 mT
Coercivity>600 kA/m
(BH) max44-56 Kj/m³
Pull strengthApprox. 5 lbs
AdviseThis is not a toy. Inappropriate use might cause injury.

Ndfeb magnet segment for brushless DC motor

Delivery

All available shipping ways could be applied, by courier, by air or by sea.

Appointed shipping company or our own forwarders all could be used in shipment.

Full-way tracking the cargos for you before the goods arrive.

 

Buyer's Guide

In order to quote you the best price quickly, please provide the following information:

1.Product size,grade,coating,etc.

2.Order quantity;

3.Attached the drawings if customized
4.Any special packing or other requirements

 

Our advantage

1. Fast reply: all your enquiry will be replied within 24 hours; 

2. Reasonable price: we are direct manufacturer and able to offer better price; 

3. Good quality: we are experienced in quality control;

4. Fast delivery time:7-20 days



Post Buying Request