Roof RidgeCap
Roll Forming Machine
This productis widely used in many kinds of industrial factory, civilian buildings, and wallboard for attached part product. It is producted continuously as rollforming machine instead using bending machine to make angel tile saving humanresources, lower labor cost.
This machine is composed of automaticdischarge table, feed leading table, main forming machine, cutting device,hydraulic station and computer control system.
1. The chart of process flow
Decoiling- active feeding- roll forming-measuring length- cutting to length- product to stand
2.Main equipment
Manual-decoiler, main forming machine, hydraulic cutting, product stand,
hydraulic system, electric system..
3.Technical parameters
A. Number of forming steps: 10-12
B. Material of shaft: 45# steel adjustable treatment. Outer diameter: 65mm
C. Material of roller: high grade 45# steel (plated chrome on surface)
D. Main motor power:3kw(440v 50HZ 3PH)Please confirm
E. Forming speed: 5-8m/min
F.machine dimension: about 7000mm*1000mm*1300mm
G.total weight:about 2000kgs
H.Roller: High grade No.45 forged steel, plated hard chromed on the surface ofrollers With thickness 0.05mm.
4.Hydraulic cutting
I.cutting blade: Cr12 mould steel with quenched treatment.
J.Cutting system: adopt advanced hydraulic drive, automatically cutting afterforming, no distort, no wasting, high safe factor.
5.The electrical control system with transducer keep tolerance within 2mm.
K.The main computer (PLC): Deltawith frenquency transducer
L.Controlling desktop : liquid crystaldisplay(Text Panel)
6.50% T/T prepaid and balance should bepaid before loading .
7.Delivery time: 30 working days.
8.Guarantee period: one year free service/ pay service all the machine life.
9.Installation and training:
If buyers visit our factory and check the machine, we will teach you how toinstall and use the machine, and also train your workers/technician face toface.
Without visiting,we will send you user manual and CD to teach you to install andoperate.
If buyer needs our technician to go to your local factory,please arrange boardand lodging and other necessary things.
10. Spare parts: Fuse, bearings, Fourbuttons, one chains,one magnetic valve .