Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB,CFR,CIF,FAS,CIP,CPT,FCA,EXW |
Supply Ability: | 20000Ton per Month |
Place of Origin: | Jiangsu |
Location: | Taizhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | 12Cr1Mo1VG,20G,12CrMoG,15CrMoG,etc. |
---|---|
Means of Transport: | Ocean, Air, Land |
Production Capacity: | 20000Ton per Month |
Packing: | wooden packing, hex bundled |
Delivery Date: | 20-60days |
Standard: GB 5310-2008
Application: For High pressure Boiler, Heat Exchanger
Size(mm): O. D.: 6.0-224.0 W. T.: 1-25 L: Max 18000
TY14-3P-55-01
Chinese equal Standard: GB 5310-2008
Material: 12Cr1Mo1VG,20G,12CrMoG,15CrMoG, 09G2S, 12Mn,16Mn,etc.
Application: For High pressure boiler
Size(mm): O. D.: 8-256mm W. T.: 1-35mm L: Max 12000mm
SPEC: GOST8731-74,GOST8732-78,GOST8733-74,GOST8734-75,GOST9567-75,GOST9940-72,GOST9941-72,GOST10498-63,GOST1060-76,GOST5654-76,GOST21729-76
Packing:
1. Standard export bundle wrapped with strong steel strip
2. Wooden case
3. Nylon packed
Payment: T/T
Delivery: With 50 days of order confirmation