user login

Drilling Rig Track Chain BG36 BG40 Track Link Accembly

100.0 USD
Min. Order: 1 Piece/Pieces
Payment Terms: L/C, T/T
Supply Ability: 10000/month
Place of Origin: Shandong

Company Profile

Location: Yantai, Shandong, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: ORIENT TRACK CHAIN
Means of Transport: Ocean, Air, Land
Brand Name: Orient
Product Information: Undercarriage Parts/Track Chain
Material: 35MnB
Surface Hardness: HRC48-54,deepth:4mm-10mm
Certification: ISO9001
Delivery Time: 15-25days after payment
Package: Pallet / Plywood Case
Payment Term: TT;LC;Negotiate
Business Scope: Drilling rig, Crawler Crane,Bulldozer,Excavator
Warranty: 1 years/2500 working days
Production Capacity: 10000/month
Packing: pallet
Delivery Date: stock or 15-20 days after payment
Show

Product Description

TRACK LINK ASSY FEATURE.

1. Full coverage of pitches from 101 to 317.

2. Forging: Using precision molds with ultra-high temperature forging to ensure the high quality of the product. ·Heat treatment: Through quenching and tempering and intermediate frequency quenching treatment on the rail surface, the workpiece is endowed with high-strength mechanical properties.

3. Non-destructive flaw detection inspection: do not let go of any abnormal product to ensure that the workpiece is 100% zero-defect.

4. Machining: High-precision CNC drilling and boring integrated machine tools and intelligent production lines are used to guarantee the processing quality in all directions.

5. Press-fitting: High-precision press-fitting equipment, reasonable interference fit size and continuously optimized press-fitting process ensure the performance of rail chain links.

QUALITY CONTROL

6. Implement the quality management system of the whole process, all-round, and full participation. Raw materials are selected and accepted in strict accordance with the standards

7. The production process is strictly operated in accordance with the "Operation Instructions"

8. All processes are strictly inspected and controlled in accordance with the "Quality Control Plan"


Post Buying Request