user login

180 Meters Small Water Well Drilling Machine Farming Industrial Borehole

6800.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU, Money Gram
Supply Ability: 20000 sets per year
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean, Air, Land
Price: Negotiation
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 20000 sets
Delivery Time: Within 7-12 days
Power Type: Diesel
Application: Geological Exploration
Color: Yellow,Yellow or as your rquest
Drill depth: 180 meters
Drilling Diameter: Customized
Drilling angle: 90 ~75°
Production Capacity: 20000 sets per year
Packing: Wooden case or naked
Delivery Date: Within 7-15 days
Show

Product Description

NL180 Water Well Drilling Rig Information


NL 180 is a water and air drilling rig . It is mainly suitable for drilling water wells,agricultural irrigation wells, geothermal air conditioning holes and other wells, especially suitable for water intake projects inmountainous areas and rock formations. .


NL 180 Water Well Drilling Rig Technical Parameters:


NL 180


Overall weight (T )

4.2

Dimension (mm )

3800*1700*2350

Drilling diameter (mm )

130-294

Drilling depth (m )

220

One-time advance length of the drill(mm)

3000

Traveling speed (km/h )

2.5

Climbing ability (max )

30

Minimum Ground Clearance (mm)

250

Working Air Pressure (mpa )

1.7-2.5

Air consumption I Pl3Zrain)

15-27

Main machine power (kw)

Yunnei 60Kw

Rotary Speed (rpm)

48 - 70

Rotary torque (Nm )

4200-5600


NL 180 Water Well Drilling Rig Main Features


1. Equipped with Yuchai-powered four-cylinder Guosan engine, which ensures that the impact of emissions on the environment while the machine is operating is minimized to the most environmentally friendly level.

2.The use of dual-motor rotation increases the turning torque up to 8500N.m The drilling of water wells at the same time protects the environment and has stronger environmental adaptability.

3.These series water well drilling rigs are equipped with Kaishan LGCY series or KSCY series portable diesel screw air compressors. The rotor of 4.Kaishan compressor is directly driven, no speed gear, lower speed and higher efficiency, so the compressor can continue to be mechanical The equipment provides stable and efficient power and supports the rig work in a high-speed and stable manner.


NL 180 Water Well Drilling Rig FAQ


Q1.What is the main function of our hydraulic tricycle tractor water well drilling rig?

Ans.: It has different models used for all kinds of hole diameter and depth, it is the best choice for drilling works.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving your advance payment.
Q4.What is the warranty of our machine?
Ans.:Our main machine enjoys a 1 year warranty, during this time all accessories broken can be changed for a new one.

And we provide videos for machine install and operation.
Q5. What is your terms of packing?
Ans.:Generally, we use standard exported wooden case for LCL goods, and fixed well for FCL goods.
Q6. Do you test all your goods before delivery?
Ans.: Yes, we have 100% test before delivery.And we will attach our inspect report for every machine.
Q7.Do you Preferred provide wear parts for transacted clients?
Ans.: Yes, we have record s for your clients, and will prefer providing accessories to clients.



How can we do a good job in the maintenance of well drilling rig?


1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time

2. . Always check the lubricating oil condition of the wind motor

3. . When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole

4. . The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole

5.. When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation

180 Meters Small Water Well Drilling Machine Farming Industrial Borehole

Post Buying Request