Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 20000 sets per year |
Place of Origin: | Hebei |
Location: | Shijiazhuang, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean, Air, Land |
---|---|
Price: | Negotiation |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
Supply Ability: | 20000 sets |
Delivery Time: | Within 7-12 days |
Drilling Depths: | 100m |
Weight: | AROUND500KG |
Usage: | water well,railways, core drilling |
Dimension(L*W*H): | 1640*1030*1440mm |
Drill pipe diameter: | 42mm |
Borehole dip angle: | 90°~75 |
Production Capacity: | 20000 sets per year |
Packing: | Wooden case or naked |
Delivery Date: | Within 7-15 days |
XY -1 With 100 Meters Depth Water Well Drilling Rig For Farming Borehole Equipment
XY-1 Water Well Drilling Rig
XY-1 is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.It is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.
XY-1 Water Well Drilling Rig Technical Data
Drill | Swivel Head | ||
Drilling depth | Max.130m | Spindle speed | 1010,790,470,295,140(r/min) |
Hole diameter | Max.130mm | Spindle stroke | 450kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | ||
Rated speed | 1500r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine | ZS1105 |
Hoisting drum revolution | 121,76,36(r/min) | Rated power | 12.1KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG | ||
SIZE | 1620*970*1560mm |
XY-1 Water Well Drilling Rig Features
XY-1 drill rig is used to survey and exploration, geophysical prospecting, road and construction exploration, punching blastinghole, etc.
Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.
1. With hydro-automatic feeding device, and high drilling efficiency.
2. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
3. Close levers, convenient to operate, safe and reliable operations.
4. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas
XY-1 Water Well Drilling Rig Application
1. Used for census exploration, geophysical exploration, road and building exploration and blasting drilling and other drilling projects;
2. According to the different strata of the choice of alloy, steel grit and steel bit drilling;
3. Can drill 2-9 grade sandy clay and bedrock layer.
What is the construction technology of de watering well?
Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.
The de watering shall be carried out 20 days before the excavation of the foundation pit, so as to drain the stagnant water in the stratum in advance, reduce the groundwater level, improve the self stabilization capacity of the soil layer, and smoothly carry out the anhydrous operation. During the de watering operation, the water level observation of each well shall be done well, and the change of the head of the confined aquifer shall be mastered in time