Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW |
Payment Terms: | Paypal, L/C, D/P, D/A, T/T, WU, Money Gram |
Supply Ability: | 2000 sets per year |
Place of Origin: | Hebei |
Location: | Shijiazhuang, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Means of Transport: | Ocean, Air, Land |
---|---|
Brand Name: | Nailiang |
Price :: | Negotiation |
Drilling depth :: | 105-260mm |
Power type :: | Diesel |
Supply Ability :: | 2000 sets per year |
Warranty :: | 12 months |
Condition :: | New |
Weight :: | 6T |
Color :: | Yellow |
Rotary Head Storke :: | 3.4m-6.0m |
Rated Power :: | 55-132KW |
Production Capacity: | 2000 sets per year |
Packing: | Wooden case or naked |
Delivery Date: | Within 7-15 days |
Pneumatic Drilling Rig Introduction
This is a lightweight, efficient, versatile drilling hole equipment, which borehole drilling machine is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering. The water well drilling rig machine can work on different formations, well drilling diameter up to 245mm.
Pneumatic Drilling Rig Tech information
Pneumatic Drilling Rig | 260 meters |
Dia.hole | φ105-260mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.0MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m,6m |
Dia. Of rod | φ76, φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 8500-11000N.m |
Rotation Speed | 40-70r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions:Rock,Mud,Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling |
Dth Hammer | 4",5",6",8" Drill hammer or CIR110, 130, 150,170 |
Pneumatic Drilling Rig Features
1. The engine uses a high-power engine;
2. Walking device: the walking motor is equipped with a gear box, which is durable and has a long life;
3. Hydraulic oil pump; parallel gearbox design with separate oil pump units, sufficient power supply and reasonable distribution, unique hydraulic system design, simple maintenance and low cost;
4. Power head device; gearbox is cast in one piece, dual motors provide power, large torque, durable, and low maintenance cost;
5. Drilling rig chassis; professional excavator chassis, durable, large load-bearing, wide chain plate, little damage to hard roads;
6. Lifting force; patented design composite boom, the boom is small in size, long stroke, double cylinder lifting, large lifting tonnage;
7. The lifting boom of each drilling rig is equipped with a stopper to protect the safety of the oil cylinder and ensure the safety of work;
8. Each hydraulic oil pipe is covered with a protective jacket to make the service life of the oil pipe longer.
Pneumatic Drilling Rig Use Scope:
We are offering a wide range of Water Well Drilling Rigs and mining Drilling Rigs, which is available in various models and sizes. Extensively used in construction and other engineering related industries, these are known for their international quality and performance. These rigs are offered in various technical specifications as per the client's specific need.
Drilling Work Attentions In Process
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.