user login

Alloy Steel Crawler Track Undercarriage High Stability For Drilling Works

6800.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU
Supply Ability: 1000 sets per month
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean, Air, Land
Price :: Negotiation
Warranty :: 12 month
Supply Ability :: 1000 Sets/month
Loading Capacity :: Customized
Raw Material :: Alloy Steel
OEM :: Acceptable
Power :: Diesel Engine
Application :: Drilling Rigs
Speed :: Customized
Production Capacity: 1000 sets per month
Packing: 1*20 FCL
Delivery Date: Within 7-15 days
Show

Product Description

Product Description


The track shoe is fixed on the rail joint with high-strength bolts, and the chain rail joint and the rail are slightly pressed together with the chain rail sleeve in the way of interference fit. This vehicle uses a track with a pitch of 135mm. The track of the track is slightly sealed with a special rubber ring to prevent sand, water and other abrasive particles and corrosive media from entering the mating surface of the relative rotation. This new type of track has greatly improved the service life of the track. Even if it is used for rock roll operation, it can also avoid the excessive wear and snake-like phenomenon of the track.


Product Tech Details


Type : 3 T/3.5TBucket size: 2200*1700*500 mm
Size: 3400 *1720*1500mmCrawler material: Rubber material
Track ground length: 1600mmLoading &unloading method: Hydraulic dump
Motor size: 1115Gear type: drawbar
Gear: +3 forward gear+1 reverse gearThe height from the bottom of the bucket to the ground: 700 mm
Steering method: Clutch brake steeringStart method: Electric start
Speed : 0-18 Kilometer per hourCrawler Width size: 1630 mm



Product Advantages


It is easy to operate, has complete gear positions, and has a small load-bearing grounding pressure. this crawler mini dumper be qualified in deeper mud pits and pools and complex stone pavements. In addition, the mini dumper has a small size than the ordinary transporter that can crossing of the polar region and can easily pass through narrow rocks.



Product Application


Crawler chassis assembly is mainly used for special occasions, such as military parade, tanks, armored vehicles, etc. What are its advantages: rubber track has the advantages of protecting the ground, rubber track walking system, low noise, low vibration, comfortable riding, etc. It is suitable for situations with high speed and many transfers, and achieves the all-road performance. Reliable electrical instruments and complete machine status monitoring system provide reliable assurance for the driver to operate correctly

Due to the different use methods and soil conditions, the working life of rubber track also varies greatly. Generally speaking, its average life is about 2000 hours. However, when working in rock or easily worn environment, the service life will be halved; On the contrary, the working life will be doubled in a better environment. When the user checks the track and chassis, don't forget to drive again to check the oil level and cleanliness. This part is easy to be ignored, and there is usually less oil left.

Working Attentions


(1) It is forbidden to turn sharply on the concrete ground or hard road, otherwise the track core will be worn and the belt body will be twisted.

(2) When crossing the ridge, it is necessary to move forward at a low speed at right angles to the ridge. When crossing the ridge with a height of more than 10 cm, it is necessary to use a springboard, otherwise the track may fall off or be damaged.

(3) It is forbidden to walk and turn sharply for a long time on the gravel road, otherwise the track will be accelerated, worn and cracked.

(4) Do not work on rotten fields, otherwise the track will slip and make the traveling mechanism accumulate mud and tangle grass, affecting the normal operation.

(5) If stones or foreign matters enter between the track and the underframe, stop the operation immediately and remove the stones or foreign matters.

(6) After working on the beach or in the field sprinkled with chemicals, the track shall be washed in time.

Post Buying Request