user login

Portable Mining Survey Engineering Drilling Rig 300mm Hole Diameter 200 Meters Depth

6800.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU, Money Gram
Supply Ability: 2000 sets per year
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean, Air, Land
Price :: Negotiation
Payment Terms :: T/T, Western Union
Supply Ability :: 2000 sets per year
Packaging Details :: Standard Export Package
Power Type :: Diesel
Drilling Depth :: Drilling depth :
Usage :: Water Well,exploration
Color :: Red Yellow
Application :: Water Well drilling,Core drilling ,Sample Collecting
Voltage :: 220V/380V
Production Capacity: 2000 sets per year
Packing: Standard Export Package
Delivery Date: Within 7-15 days
Show

Product Description

Sample Collecting Gk 200 Engineering Drilling Rig



GK 200 Engineering Drilling Rig Introduction


GK 200 is equipped with bottom hole pressure gauge to indicate the pressure, which is convenient to master the situation in the hole. The handle is centralized and easy to operate.


GK 200 Engineering Drilling Rig Information


Drilling Depth

200m
Maximum open hole caliber300mm
End hole caliber75mm
Drill rod caliber60mm
Drilling angle90°~75°
Drill weight (No include power)975kg
Unity machine dimensions1433×697×1273m
Spindle
spindle speed64 128 287 557r/min
Spindle stroke450mm
Winch
Max.single line hoisting capacity2400kg
Single line lifting speed0.41,0.82,1.64m/s
steel wire rope caliber13m(35m)
Mud pump
TypeHorizontal single urn twin-action
Displacement

170/150L/min(diesel or electromotor)

Diesle engineZS1115 16.2kw 2200r/min
Electric motorY160M—4 11kw 1440r/min


GK 200 Engineering Drilling Rig Features


1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.

1.2 Geological core drilling, physical prospecting.

1.3 Small grout Confucius, drill hole drilling.

1.4 Small well drilling.

GK 200 Engineering Drilling Rig Application


Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.

With hydro-automatic feeding device, and high drilling efficiency.Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.Close levers, convenient to operate, safe and reliable operations.Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.


Precautions for courtyard drilling


1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.


Post Buying Request