user login

XIANCE-Capacitive load bank XC10.5-3000Kvar

90000.0 RMB
Min. Order: 1 platform
Trade Term: FOB
Payment Terms: D/P
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean
Technology: Others
Type: Others
Package Type: Others
Brand Name: Xian ce load box
Delivery Date: 60 days
Show

Product Description

Taier Certification Center Co., Ltd. (TLC for short), formerly known as "Theer Certification Center", is a voluntary product specialized in the information and communication industry fully funded and established by the China Academy of Information and Communications Technology (formerly the Telecommunications Research Institute of the Ministry of Industry and Information Technology). The certification body also carries out CCC, quality management system, environmental management system, occupational health and safety management system, service certification and information security management system business.

Unlike other certifications, in the Thiel certification of the unit, the requirements for capacitive loads have been added. Capacitive load bank detection of units The following two methods can be used to detect the capacitive load bank of units:

a) The resistive load is configured according to 100% of the rated active power output of the unit. And configure the phase according to the power factor leading (capacitive) 0.95

should be capacitive load. The unit runs for 1h under rated conditions. Record power, voltage, current, power factor, frequency, diesel engine cooling water (or wind) temperature, oil pressure and generator winding temperature every 30 minutes.

b) The capacitive load is configured according to 20% of the apparent power value of the unit. The active power of the unit starts from 20% of the full load and increases every half hour.

Increase resistive load to 40%, 60%, 80% and record power, voltage, current, power factor, frequency, diesel cooling outlet water (or wind) temperature, oil pressure and generator winding temperature in each state.

If your unit and power supply are entering the communication industry, then it is necessary to pay attention to this requirement.

In order to solve this problem, the first electrical test, launched a high-voltage resistance-capacitive load bank:

High Voltage Capacitive Smart Load bank Parameters

Rated voltage/frequency AC three-phase three-wire 6.3kV/10.5kV/11kv

Maximum load power Capacitive, RC50kW-3000kW(kvar)

Power factor ±0.4-1 optional

Load accuracy (per gear) ±5%

Load accuracy (whole machine) ±3%

Display accuracy 0.5 class

Control power supply External AC 220V/50Hz

Wiring method Load power input - copper bar (star connection)

Control power input - aviation plug

Communication interface RS485, RS232

Insulation class F class

Working way Continuous work

Working environment parameters

Working temperature -10℃~+50℃

Relative humidity ≤95%

Altitude ≤2500m

Atmospheric pressure 86~106kPa

Main component brands

Contactor Sunlight

Fuses Ming Rong

PLC Siemens