Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB,CFR,CIF,EXW |
Payment Terms: | Paypal, L/C, T/T, WU, Money Gram |
Supply Ability: | 10000000 tons |
Place of Origin: | Hebei |
Location: | Handan, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | ZDP-5-8 |
---|---|
Means of Transport: | Ocean, Air, Land |
product name: | scaffolding pipe |
Material: | S235J0H,S355J0H |
Surface treatment: | Hot Dip Galvanized |
Size: | 48.3mm |
wall thickenss: | 3.2mm,4.0mm |
Standard: | EN39,EN10219,BS1139,JIS G 3444 |
type: | ringlock scaffolding |
apllication: | building contruction |
color: | silver |
certificate: | ISO,CE,API |
Production Capacity: | 10000000 tons |
Packing: | bundle with steel trips or based on requried |
Delivery Date: | 5days |
Outer diameter | 48.3mm |
3.2mm/4.0mm | |
Pipe length | 1.5ft,8ft,10ft,13ft,16ft. |
2.SRL: 3-5.8m DRL: 10-11.8M or as clients requested length | |
3.Fixed length (5.8, 6, 12m) | |
Standard | EN39,EN10219,BS1139,JIS G3444 |
Material | S235J0H,S355J0H,Q235L Q345L,STK400,STK500 |
Ends | Plain ends |
Surface treatment | hot-dipped galvanized |
Packing | 1.Waterproof plastic cloth |
2.Woven bags | |
3.PVC packing | |
4.Steel strips in bundles | |
5.As requirement | |
Applications | 1.scaffolding and formwork system |
2.For construction | |
3.ringlock scaffolding | |
4.scaffolding system | |
Payment and trade terms | 1.Payment terms: T/T and L/C |
2.Trade terms: FOB/CFR/CIF | |
3.Minimum quantity of order: 5MT (5000kg) | |
Delivery time | 1.Usually, within10-20 days after receiving your down payment |
2.According to the order quantity | |
Test | Chemical component analysis, mechanical properties, technical properties, exterior size inspection, hydraulic testing , X-ray test |
Advantages | 1.Reasonable price with excellent quality 2.Abundant stock and prompt delivery 3.Rich supply and export experience, sincere service 4.Reliable forwarder, 2-hour away from port |