user login

Modular Formwork Suzhou TECON Construction Technology

Payment Terms: L/C, T/T
Supply Ability: 800 ton per months
Place of Origin: Jiangsu

Company Profile

Location: Suzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer

Product Detail

Production Capacity: 800 ton per months
Packing: By pallet
Delivery Date: 20-45 days after deposit

Product Description

As one of the leading specialists in scaffolding concrete formwork and scaffolding engineering, our wide range of off-the-shelf and customized products ensure that we can provide solutions for your construction projects, regardless of size or location.

 

TECON Modular Formwork mainly consists of AluLITE Formwork, Steel LITE Formwork and Plastic Formwork TP60+.

 

For any villa project, low cost housing project, especially with hundreds of or thousands of houses at same plan and size, modular formwork for concrete can maximize the site productivity and save labor cost greatly.

 

In some occasions, even compare with conventional building method such as bricks and concrete hollow blocks etc. build with rebar and concrete via modular shuttering formwork will still benefit you from lead time and total cost per house though the initial investment seems higher than traditional bricks and timbers.

 

Modular Formwork can not only build wall and slab separately, but also build wall and slab together in one time pour with customized formwork planning and fabrication. Very timber and even no skilled workers are needed due to their easy to learn assembly sequence.

 

Advantages of Modular Formwork

The modular formwork system is designed with standardized panels and components to reduce or limit the need to cut materials on site. This speeds up the entire process and therefore reduces on-site labor. They can also be interchanged with conventional methods. Commercial, civil, and industrial contractors can replace the traditional methods of cast-in-place concrete engineering by using modular formwork systems and easily achieve one-time casting, thereby minimizing the financial expenditure of labor and materials. By choosing to lease, contractors can gain more benefits in reducing the costs associated with regular procurement. Once the work is completed, this also eliminates the need to recover the purchase cost by reselling the materials.

 

Types of Modular Formwork

 

AluLITE Formwork

TECON Aluminium Formwork AluLITE is a new material system formwork made from alu...

 

Plastic Formwork TP60+

TECON Plastic formwork TP60 is recognized as the lightest formwork system due to...


Post Buying Request