user login

REDUCER HEX NIPPLE Thread Reducer Hexagon Nipple Stainless Steel Wedling Nipple

Payment Terms: L/C
Supply Ability: 40 tons/month
Place of Origin: Hebei

Company Profile

Location: Cangzhou, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Brand Name: JINSON
Production Capacity: 40 tons/month
Packing: plastic bag carbon box pallet
Delivery Date: 30-100 days
Show

Product Description

REDUCER HEX NIPPLE Thread Reducer Hexagon Nipple  Stainless Steel Wedling Nipple

If you are finding thread reducer hexagon nipple in China, we will be your best choose! We have our own factory, so we can give you a cheap price!

STANDARD

SIZE
ITEM

1/8"

1/4"

3/8"

1/2"

3/4"

1"

11/4"

11/2"

2"

21/2"

3"

4"

JINSON

I


14.5

18

21.5

27

34

42.7

48.5

60.5

78

91

116

L


22.5

26.5

30.5

35.5

39.5

45

47.5

51.5

59

64.5

74

 

Product type

Threaded Fittings

Product name

Reducer Hex Nipple

Place of Origin

Cangzhou Hebei, China (Mainland)

Production process

Stainless steel precision casting

Process standards

ASTM A351

Processing technology

CNC lathe

Medium

Air, steam, kerosene, water, oil and other fluids

Materia

Stainless Steel, SS 304/ SS 316

Specifications

1/8″—4″

Thread standard

ISO7/1 (BSP/DIN2999),  NPT (B1.20.1)

Working pressure

150LBS

Working temperature

-20℃ to +220℃

Inspection standard

ISO7-2,ISO4990,ISO4991

Packing method

Ⅰ.Plastic bag&carton &plywood tra

Ⅱ.According to the customers' requirements

Payment Terms

T/T,L/C

Delivery

Transport by Sea/Air/Express/Pickup

 

Application

We supply Threaded Fitting to a wide range of industries:

Chemical manufacturing process

Oil, gas and petroleum

Paper industry hydraulics and factory processes

Shipbuilding

Building services

Water industry

Nuclear industry

Biofuel manufacturing

Automative paint spray systems

Food manufacturing processing

 

Our Advantages:

* PRICE ADVANTAGE

Have our own factory, over 40 tons/monthly production capacity. Threaded Fittings price is more competitive than others.

* DELIVERY ADVANTAGE

The delivery date is short, 1-3 months production time, give more support for your whole sale & projects.

* EXCELLENT QUALITY

ISO9001 among the production line, guarantee the time as well as quality.

 


Post Buying Request