Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,DDP,CIP,EXW |
Payment Terms: | L/C, T/T |
Supply Ability: | 60set/months |
Place of Origin: | Sichuan |
Location: | Chengdu, Sichuan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | HL240C-LJ-140 |
---|---|
Means of Transport: | Ocean, Land |
Type: | Others |
Brand Name: | Forster |
Generator type: | Brushless Excitation |
Rated Voltage: | 380V,400V,6300V |
Water Head: | 10.4-27.4m |
Flow Rate: | 1.65m3/s-34.41m3/s |
Rated power: | 500kw-10mw |
Governor: | High Hydraulic Microcomputer Governor |
Runner material: | stainless steel |
Processing method: | CNC machining / constant temperature annealing |
Keyword: | Francis Turbine |
Frequency: | 50Hz/60Hz |
Production Capacity: | 60set/months |
Packing: | wood box |
Delivery Date: | 150-180days |
Automation Unit Valve Governor Transformer 500kw 1mw 2mw 3mw 4mw 5mw 10mw Hydro Francis Turbine For Hydro Power Plant
Our main products included:
1.Kaplan turbine generators series.
2.Turgo turbine generators series,e.g. vertical type horizontal type.
3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
4. Francis turbine generators series.
5.Pelton turbine generators series and double turbine generators series and so on.
6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Product features :
The Francis turbine is suitable for medium head pressure and high flow rate. The manufacturing requirements for the volute, runner and draft tube are higher than those of the general unit. The design of the runner of the high head Francis turbine is different from that of the general Francis turbine. X-shaped blades or short blades.
The Francis turbine is compact and efficient, and can adapt to a wide range of heads. The Francis turbine is one of the most widely used turbine types in the world. When the water flows through the runner of such a turbine, it enters in a radial direction and flows out axially, so it is also called a radial axial flow turbine.
1.Francis turbine has the advantages of compact structure, high efficiency and can adapt to a wide range of water head of turbine type. It is one of the widely used around the world;
2.When the water flow through the turbine wheel, it enters to radial, axial flow, so it is also called the radial axial flow turbine;
3.Francis turbine is also called the Francis turbine. The water flow from the surrounding radial inflow runner, then approximate axial flow runner, runner by the crown, under the ring and the blade;
4.It is applicable to the head from a range of 20 meters of up to 700 meters, has the advantages of simple structure, stable operation, and high efficiency, but it is generally used in the head in the range(50 to 400 meters). Single output from tens of KW to several 101000 tile. At present this kind of turbine maximum output has exceeded 700000 kilowatts. A turbine is one of the most extensively used.
5.The francis turbine has more customers to choose from because of its high efficiency and low loss of generators and turbines.
Product parameters:
HL-WJ-Francis tubine generator unit | Generator | Gevernor or Regulating work | Valve | |||||
Turbine | ||||||||
Type | Water head(m) | Discharge (m³/s) | Speed (r/min) | Power(kw) | Efficiency(%) | |||
HL240C-LJ-140 | 16.8 | 11.65 | 214.3 | 1720 | 89.4 | SF1600-28/2600 | YWT-18000 | PDF60(40)-WYDg2250 |
19.5 | 12.55 | 250 | 2150 | 89.6 | SF2000-24/2600 | |||
22.6 | 13.52 | 2688 | 89.6 | SF2500-24/2600 | ||||
26.7 | 14.7 | 300 | 3440 | 90 | SF3200-20/2600 | YWT-30000 | ||
30.8 | 15.76 | 4255 | 90 | SF4000-20/3250 | ||||
35.7 | 16.78 | 5319 | 89.4 | SF5000-20/3250 | ||||
HL240C-LJ-160 | 16.2 | 14.95 | 200 | 2128 | 90.3 | SF2000-30/2600 | YWT-30000 | PDF60(40)-WYDg2500 |
18.8 | 16.1 | 2688 | 90 | SF2500-30/2600 | ||||
22.2 | 17.48 | 250 | 3420 | 89.5 | SF3200-24/3250 | YWT-38000 | ||
25.7 | 18.83 | 4225 | 90 | SF4000-24/3250 | ||||
29.9 | 20.29 | 5319 | 90.5 | SF5000-24/3250 | YWT-50000 | |||
34.8 | 21.91 | 300 | 6702 | 90.6 | SF6300-20/3250 | |||
HL240C-LJ-180 | 16.1 | 18.84 | 187.5 | 2660 | 90.3 | SF2500-32/3250 | YWT-38000 YWT-50000 | PDF60(40)-WYDg2800 |
19 | 20.45 | 3402 | 90.8 | SF3200-32/3250 | ||||
22 | 22 | 4263 | 90.7 | SF4000-32/3250 | ||||
25.5 | 23.74 | 200 | 5319 | 89.7 | SF5000-30/3250 | |||
29.8 | 25.63 | 250 | 6702 | 89 | SF6300-30/4250 | |||
34.7 | 27.66 | 8421 | 90.8 | SF8000-24/4250 | ||||
HL240C-LJ-200 | 16.5 | 23.53 | 150 | 3402 | 91 | SF3200-40/3250 | YWT-50000 | PDF60(40)-WYDg3200 |
19.1 | 25.36 | 4255 | 90.3 | SF4000-40/3250 | ||||
22.2 | 27.32 | 5319 | 91 | SF5000-32/3250 | ||||
25.9 | 29.5 | 187.5 | 6702 | 91 | SF6300-32/4250 | YWT-44000 YWT-50000 YWT-58000 | ||
30.3 | 31.94 | 8510 | 90 | SF8000-32/4250 | ||||
35.5 | 34.41 | 200 | 10638 | 89.8 | SF10000-30/4250 |
Product pictuers:
Installation Diagram
Other products:
Company Information
Our Workshop:
Advantages:
Packaging & Shipping
Engineering Case
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.