user login

Plastic Injection Mould Washbasin Mould Taizhou Supplier

10000.0 USD
Min. Order: 1 Set/Sets
Payment Terms: Paypal, L/C, D/P, D/A, T/T, WU, Money Gram
Supply Ability: 30 Set/Sets per Quarter
Place of Origin: Zhejiang

Company Profile

Location: Taizhou, Zhejiang, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean, Air, Land
Product Material: Steel
Product: Household Appliance
Shaping Mode: Plastic Injection Mould
Brand Name: Tuofang
Mould materail: P20
Mould base: C45 Steel Tuofang customized
Cavity No.: 1
Hardness of cavity, core / Hardness of wear parts: HRC 30-34 / HRC 50-60
Ejection system: Ejection system
Runner: Hot runner
Design software: UG NX
Plastic materail: PP
Mould life: 300000
Delivery time: 65 days for first test sample, 7 days for prepare shipping after sample approved
Production Capacity: 30 Set/Sets per Quarter
Packing: wooden case
Delivery Date: 65 days
Show

Product Description

Quick Details

Place of Origin: Zhejiang, China (Mainland)

Brand Name: other

Model Number: Customized

Shaping Mode: Plastic Injection Mould

Product Material: Steel

Product: Vehicle Mould

Product Name: plastic injection mould washbasin mould Taizhou supplier in China

Material: Steel

Mould material: P20.718HH

Mould life: 250000-300000shots

Mould base: C45

Design software: UG

Cavity: 1*1

Surface treatment: Polishing

Runner: Hot Runner

Name: Make Plastic Injection Mould

 

Supply Ability: 30 Set/Sets per Quarter

Packaging Details : wooden case

Port: Ningbo

Lead Time : 70days

 

Manufacting flow of mould:

1. RFQ: get the sample or drawing from customer, analyze and quote as per customer requests, give some professional suggestions to help customer improve the product.

2. Negotiation: Discuss about the mould steel, delivery time, payment term and so on.

3. Place an order: customer confirms the plastic material, injection machine spec and other details, we start make the design.

4. Mould design: make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests.

5. Mould tooling: start the mould tooling after mould design confirmed.( Cut steel, CNC machining, polishing, testing)

6. Mould processing: Mould process photo or video update to customer each 10 days.

7. Test sample: T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve.

8. Delivery: Once sample approved, will ship the moulds within 7 days after get customer shipping instruction

9. Shipping: By sea/ Air Nearest port: Ningbo or Shanghai / Shanghai or Hangzhou

 

Our Service

Pre-sale service:
The good sale person for professional and promptly communication
In-sale service:
Our designer teams will support customer R&D,make the product and mould design as per customer request, do the modification and give the professional suggestion for improve the product. Update the mould process to customer
After-sale service:
Suggest the mould maintance, If the mould have quality problem during our guarantee period, will freely supply the wear part for replace the broken piece and technique support; also if you have any issue in using our moulds, we provide the  professional suggestions and helps

 

Shipping prepare

We will prepare the some wear parts, like spring, ejector pins, cooling conector, eyeblot.pack with the mould

 

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big moulds

Q: Do you provide samples ? is it free or extra ?

A: Yes, we will send the smaple to customer, and will part two time freight fee.

Q: What is your terms of payment ?

A: 50% T/T in advance ,balance before shippment. 

 

If you have any further questions, please contact with us as below: 

Contact Person: Emma Zhang 

Mobile/Whatsapp/Wechat: 008615215817209

QQ: 1579695869

Email: sales1(@)chinatuofang.com

 


Post Buying Request