Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 15 Set/Sets per Year |
Place of Origin: | Hebei |
Location: | Shijiazhuang, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Model No.: | WX-03 |
---|---|
Means of Transport: | Ocean |
Production Capacity: | 15 Set/Sets per Year |
Packing: | woodenbox |
Delivery Date: | Finish the order for 1-3 months |
Gypsum board production line is the current production of new special equipment for decorative materials, the main work processes include:
1. The plaster and water and various additives, respectively, by automatic metering, automatic delivery system into the mixer, mixing into a gypsum slurry, and evenly sprinkled in the continuous forward movement of the face paper;
2. In the continuous forward while vibrating, the slurry gradually spread evenly, then into the extrusion molding machine and the upper and lower face paper complex, by the extrusion molding pulp is completely covered by the upper and lower skin paper, and extruded into Continuous slurry gypsum board;
3. The board in the molding line during the operation after shaping, natural solidification, automatic cutting, etc. have been gradually formed wet solid gypsum board, wet board by the program-controlled system, through the roller, belt conveyor and flap quickly into the drying room;
4. The board in the drying room under the strict control of each temperature zone, and into the hot air at different temperatures, wet plate evaporation, starch reaction and the board bonded to the protective paper, dried gypsum board from the drying room stand out;
5. And then flap again and pieces (front-facing), the length of the saw will cut the board into a certain size of the finished board;
6. The final delivery to automatic head and automatic stacking, palletizing completed by the forklift truck to the finished product warehouse.
Service items:
1. My company has a professional installation team, home installation and commissioning, until the production of qualified products so far;
2. Long-term supply of spare parts, equipment warranty for one year
3. Responsible for long-term technical advice and technical services, ready to solve a variety of technical problems
4. Charge d'affaires shipment and the relevant import and export procedures.
The progress of the project construction, project approval, process layout, civil construction, equipment selection, production and installation, production commissioning, trial production stage, the entire process can be completed in 3 to 5 months.
Our service:
(1)Turnkey solution inquiry
(2)One year for free maintainence
(3)One year for free for replacing machine parts
(4)Workshop layout design