user login

High Frequency Welded Tube Mill Line ERW76

Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: as your demands
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Means of Transport: Ocean
Type: Mill
Application: Others
Brand Name: zhongtai
Production Capacity: as your demands
Packing: As your demands
Delivery Date: 2-3 month
Show

Product Description

Description


ERW76 H.F. Straight Welded Pipe Production Line

ERW76 high frequency longitudinal welded pipe production line / pipe making machine / tube mill is designed to produce welded pipes of 32mm-76mm in OD and 1.2mm-4.0mm in wall thickness, as well as corresponding square and rectangular pipe. 
 
Products: GI, carbon steel and stainless steel tubes for metallurgy, construction, transportation, machinery and vehicle industries.

Equipment advantages

√ High production efficiency, line speed can be up to 120m/min.
√ High yielding, the machine works stably at a high speed, which improves the yielding of products.
√ Low wastage,  low unit wastage and low production cost.
√ High accuracy, diameter error is only 0.5/100 of the pipe OD.
 
 
Basic Technical Information of Welded Pipe Production Line
 

Product&yieldRound Pipe32mm-76mm                   Thickness:1.2mm-4.0mm
Square & rectangle tube25mm×25mm -60mm×60mm     Thickness:1.2mm-3.0mm
Length6m-12m                       Length Tolerance: ±3mm
Production Speed20-120 m/min
Production capacity20,000ton/year
ConsumptionMill installed capacity120 kw
Line Area70m(length) ×5m (width) 
worker6-8 workers
Raw MaterialCarbon Steel coilQ235B(ASTM GR·D,σs 230)
Width105mm-240mm                 Thickness: 1.2mm-4.0mm 
Coil ID450-520mm
Coil ODMax 1600mm
Coil Weight2.0t

 
 

Round pipeCold roll forming processGood roller design
Square & rectangular pipeGeneral round-to-square processStable forming process
Round to square with turksheadGood pipe quality, reach same wall thickness with round pipe 

 



Price


  • Delivery Port :Tianjin


  • Packaging & Delivery


  • Packing :As your demands

  • Delivery Lead Time :2-3 months



Post Buying Request