user login

Original Equipment Technology OEM Available Electric Stove Original Equipment Technology OEM Available Electric Stove

58.0 USD
Min. Order: 1 Piece/Pieces
Supply Ability: 1-7
Place of Origin: Zhejiang

Company Profile

Location: Jinhua, Zhejiang, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 43
Installation: Countertop: Certification: CB, CE, EMC, UL
Type: Fireplace Burners: Power (W): 750
Housing: Metal: Installation: Freestanding
Production Capacity: 1-7
Packing: Standard export package
Delivery Date: 10-35 days
Show

Product Description

 Frame Material
  MDF (CARB certificated)
  Hardware Material  Metal
  Outlet  900/1800W for 220V-240V or 750W/1500W for 110V-120V
  Energy Output  5000 BTU/Hour
  Safety Features  Safety overheat cut-off device
  Power Source  Electrical Plug-In
  After-sales  One Year Warranty
  Dimensions  50.7(w)x27.8(d)x63(h)cm
  Advantage

  1)  Operates with or without heat for all season enjoyment

  2)  Adjustable flame control

  3)  Safety overheat cut-off device, Cool touch exterior

  4)  Remote control works from anywhere in the room

  5)  Strictly according to GS/ ROHS, ETL regulations


Details

Installation:

Countertop

Hot Plate Surface:

Solid Hotplate

Housing:

Metal

Certification:

CB, CE, EMC, UL

Power (W):

750

Voltage (V):

220

Place of Origin:

Zhejiang, China (Mainland)

Brand Name:

warrmth

Model Number:

EFNDY-2181M .

Type:

Fireplace Burners

Imported Materials Provide ODM indoor portable stoves

OUR COMPANY  655CARGO ARE SPECIALIZED IN TRANSPORrTATING GOODS FROM CHINA TO RUSSIA.OUR MAIN BUSINESS ARE INCLUDED "PURCHASE" "CUSTOMS" "CARRIAGE" "CUSTOMS CLEARANCE".WE CAN PROVIDE" DOOR TO DOOR" BUSINESS SERVICE.

    OUR HEADQUARTER IS LOCATTED IN YIWU CITY CHINA, WHICH IS THE WORLDWIDE COMMODITY TRADE CAPITAL.AND THERE ARE BRANCHES IN ALMATY,BISHKEK, MOSCOW ST.PETERSBUrG,ROSTOV, EKATERINBURG,THE ARCTIC DITCH.WE HAVE PROFEESIONAL TEAM TO PURCHASE AND CUSTOMS CLEARANCE.

1.Air Transportation: 3-5days

2.Land Transportation:(fast speed):  10-15days

3.Land Transportation(low speed):18-25days

4.Sea-Railway Combined Transportation:30-35days

5.We can provide reasonable  transportation sulution as your requirement and provided all the normal customs clearance documents

6.Our purpose and principles is " safety " "fast" "high-efficiency"


Post Buying Request