Min. Order: | 10 Piece/Pieces |
---|---|
Payment Terms: | Paypal, L/C, T/T, WU |
Supply Ability: | 500000 Piece/Pieces per Month |
Place of Origin: | Zhejiang |
Location: | Wenzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Model No.: | KG-HL-D101 |
---|---|
Means of Transport: | Ocean, Air, Land |
Place of Origin:: | Zhejiang, China (Mainland) |
Protection Level:: | IP65 |
Installation Net:: | LV: AC220V, AC380V |
Material::: | PC\ABS |
Dimension:: | 344mmx236mmx115mm |
Installation type:: | wall mounted/pole mounted |
Frequency:: | 50Hz or 60Hz |
Installation location:: | Indoor/outdoor |
Rated insulation voltage UI:: | 800V |
Main busbar rated current In:: | 10A~250A |
Production Capacity: | 500000 Piece/Pieces per Month |
Packing: | in a standard export carton or according to customers' special requirements. |
Delivery Date: | 20 days after comfirming the payment |
Single phase high protection smart energy meter box Product Description:
Single phase high protection smart energy meter box:
Technical Specification | |
Installation Network: | LV: AC220V,AC380V |
Installation type: | wall mounted/polc mounted |
Installation location: | Indoor/outdoor |
Frequency: | 50Hz or 60Hz |
Main busbar rated short time withstand current low: | 30kA |
Insulation resistance: | ≥20MΩ |
Rated insulation voltage UI: | 800V |
Material: | PC+ABS |
Protection Class: | IP65 |
Life Expectancy: | ≥30 years |
Main busbar rated current In: | 10A~250A |
Dimension(LxWxD): | 344x236x115mm |
Model | Position | Name | Specification | Qty |
KG-HL-D101 | Front of meter | Disconnect switch | HUH17-100/2P 63 A | 1 |
Back of meter | MCB | DZ47-2P/C32A | 1 | |
KG-HL-D102 | Front of meter | Disconnect switch | HUH17-100/2P 63 A | 1 |
Back of meter | Terminal Box(Two in and two out) | AFJ6/JHD-8/A | 1 | |
KG-HL-D103 | Front of meter | Circuit breaker | DZ47-2P/C63A | 1 |
Back of meter | RCCB | DZ47LE-32/1N | 1 |
Single phase high protection smart energy meter box
Single phase high protection smart energy meter box
Single phase high protection smart energy meter box FAQ
Q1: Are you a factory or sales company?
A: We are a factory.
Q2: When get the goods if we place an order?
A: It depends on your order quantity, 3 days for small order, 7-14 days for big order, special or urgent demands should be evaluated.
Q3: What is your accepted payment term?
A: We could accept L/C, T/T, West Union and even Paypal.
Q4: How about the transportation?
A: It depends on your demands. For small, urgent order, we could arrange the air transportation; it takes about 3-5 days on the way. For most orders, we always arrange the boat shipment through Ningbo/Shanghai port.
Payment Terms | |
T/T | 30% T/T in advance,paid the balance before shipment |
L/C | L/C amount above 50,000 usd,we can accept L/C at sight |
West Union | Amount lower than 3000usd |
Trade Assurance (Paid by credit card) |
Please go through our product, and inform us if you need further information.