user login

Hotel Use Prefab Modular Bathroom Pod

260.0 USD
Min. Order: 50 Square Meter
Trade Term: FOB,CFR,CIF,EXW
Payment Terms: L/C, T/T
Supply Ability: 8000 M2/month
Place of Origin: Hebei

Company Profile

Location: Shijiazhuang, Hebei, China (Mainland)
Business Type: Manufacturer

Product Detail

Model No.: 010
Brand Name: wzh
Production Capacity: 8000 M2/month
Packing: According to customer requirements
Delivery Date: 25 days
Show

Product Description

Quick Information


  • Brand Name:WZH

  • Place of Origin:China

  • Model Number :010


  • Description

    Hotel Use Prefab Modular Bathroom Pod
    Bathroom pod is ideal for large-scale building project now, especially hotel, school, healthcare, student accommodation, and some residential building. This type modular bathroom units can be made significantly more efficient and profitable by exact specifications of each client to guarantee complete satisfaction.
     
    The structure of the bathroom pod toilet is light gauge steel framing which is made of cold formed galvanized or galvalume steel material, Z275/AZ150, high strength G550. The vertical structure will be supplied with holes in advance for the passage of electrical cables and hydraulic pipes.

    Insize views

    Structure:

    Why choose bathroom pod?

    Our light gauge steel framing(LSF) bathroom pod allow clients to achieve a cost which is far lower than traditional construction method, use modular bathroom pod:

    1Greatly reduce build costs.
    2Save construction time and labor cost
    3Reduce the risk of project delay
    4Lower carbon because of fewer materials wasted
    5Less risk of health and safety problems on site
    6Easy and fast install, reduce supervision of skilled labor
    7Fully fitted and preassembled, installation can be finished in a matter of hours
    8Fully finished and can be loaded and transported directly, also convenient to load and unload.


    Application



    Price


  • Delivery Port :According to customer requirements


  • Packaging & Delivery


  • Packing :According to customer requirements

  • Delivery Lead Time :25 days

  • Supply Ability :8000 M2/month



Post Buying Request