Min. Order: | 120 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 9000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 2-137 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Design & quote: | We can make design and quotation according to your require or your drawing |
Drawing Design: | by client or by us |
Main structure: | Welded H section,Lattice structure,Tubular column or beam,space frame etc |
Installation: | Provide full set of construction drawings and video to direct installation; |
Production Capacity: | 9000 Ton/per Month |
Packing: | Bolts and accessories loaded into wooden box |
Delivery Date: | usually as customers'order |
1. Typical Surface treatment for Steel building ( made of H steel column ) :
Surface Treatment |
Hot dip galvanize |
Standard : JIS , DIN , ASTM B695 - 2000 |
Hot dip galvanizing hole cutting good looking on surface |
Galvanizing process : Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing → Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product |
Paint |
1 . Primer paint one coat 20 - 30 um |
2 . Middle paint two coat 40 - 60 um |
3 . Finish paint one coat 20 - 30 um Paint type : 1 . red primer 2 . zinc primer 3 . Alkyd primer |
2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, Steel building ( made of H steel column ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
3. Project case- Ningxia prefabricated steel structure workshop, 23000 SQM:
main structure:welding H steel or round steel
knee brace: Angle steel
roof ridge: corrugated steel sheet
Wrapping cover:color steel sheet
roof gutter: color steel sheet
rain spout: PVC pipe
doors: sliding sandwich panel door or metal door
windows: PVC OR ALUMINUM WINDOW
connecting: high strength bolts
characteristic: environment-friendly
lower cost and maintenance easily
4. Our company' s design and quotation capability for Steel building ( made of H steel column ) :
1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.
2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.
3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.
5. Packing & Delivery for Steel building ( made of H steel column ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) How to install Steel building ( made of H steel column ) ?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no work teams, we can send our professional teams to install for you.
2) Storage Life of Steel building ( made of H steel column ) ?
Reply: All steel structure frame life is more than 50 Years, all cladding sheets are about 20 Years.
3) How can you deal with deformation when welding ?
We select suitable welding method, material and sequence as specified material required.