Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | CIF |
Payment Terms: | L/C |
Supply Ability: | 9000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 2-108 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Material Grade: | European S235& S355 ASTM A36& A572 JIS SS400 |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Standard: | ISO standard GB standard Japanese industrial standard |
Certificates: | 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE |
Surface Treatment: | Gray paint, red paint, white paint, epoxy zinc etc. Or Galvanized |
Production Capacity: | 9000 Ton/per Month |
Packing: | Components will be packaged by steel pallet |
Delivery Date: | 20 days |
1. Data of the Steel building ( made of built-up H section ) :
Specification | |
Material : | Grade Q235 , equivalent to ASTM A36 Grade Q345 , equivalent to ASTM A572 |
Section : | Any product shape according to customer's requirements |
Certification : | ISO quality system , Chinese GB50221 - 2001 |
Sand Blast : | SA 2.5 Sand blasting |
Welding Technology : | Single level butt welding , fillet welding by electric arc welding , and Gas shielded welding |
Surface treatment : | Hot dip galvanized , Epoxy zinc rich primer Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02 |
Welding Testing | Ultrasonic Testing , X-ray Testing |
Manufacturing Technology | Drilling , Cutting , Assembling , Welding , Rectification , Testing etc |
2. Brief of us:
We were founded in Shandong, which holds 100 million RMB registered capital. Our company is located in northern China, and it covers an area of 360, 000 square meter. Our company was specialized in the design and manufacture of steel structure workshop, high rise steel building, prefab building, and other related steel products. The products of our factory have always been wildly recognized by both abroad and domestic customers in the past ten years. In the year 2008, our company was officially designated as the main supplier of steel structure project by Shandong government. And our products that were exported to west Asia and South American etc were widely popular among our customers.
The main metal products designed and processed by our company include steel structure workshop, exhibition hall, civil structure building, high rise building, industrial steel structure for power plant, solar, oil& gas, chemical etc.
3. Market covered:
Euro-market: German, England, French, Russia, Georgia
The American market: USA, Canada, Venezuela
Oceania market: Australia, New Zealand, Samoa
The Africa market: Angola, Algeria, Ghana
4. Our engineer team for Steel building ( made of built-up H section ) :
We owns 36 TEKLA professional designers, by applying computer work station.
They make the model for steel structure items assembling, define the assembly dimension and inspect the connection status of each joint in three-dimensional way through difference perspectives,
which has optimized the design for realizing 100% successful bolt installation, greatly enhancing working efficiency.
We owns 15 professional STAAD-Pro designers.
As for secondary design and partition treatment of drawings, our design team applies STAAD-Pro together with Ram Connection module to optimize joint design to establish scientific and reasonable assembly design scheme.
5. Packing & Delivery for Steel building ( made of built-up H section ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Q: How could I control the cost of building a Steel building ( made of built-up H section ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a Steel building ( made of built-up H section ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a Steel building ( made of built-up H section ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.