Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | CIF |
Payment Terms: | T/T |
Supply Ability: | 8000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 2-099 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Standard: | AISI, ASTM, BS, DIN, GB, JIS |
Drawing Design: | dwgs Detailing by us |
Software used: | AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures( Xsteel )V12.0.etc |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Surface Treatment: | galvainzed, then painted |
Production Capacity: | 8000 Ton/per Month |
Packing: | sea worthy packing |
Delivery Date: | 15 to 40 days |
1. Fill the Table below and Sent It to Us, to Get Your Free Proposal for Steel building ( made of frame structure ) :
Your location | Country ________ State ________ City _______ Postal code ________ |
Size | Length ________ meter Width ________ meter Height ________ meter |
Storey | Storey number ________ |
Wind Load | ________ km / hour |
Snow Load | ________ kn / m² |
Anti - earthquake | ________ magnitude |
Roof Normal Payload | ________ kg / m² |
Brick wall needed or not | If needed , brick height ________ |
Thermal insulation if needed | If needed , EPS panel , PU sandwich panel Glass wool panel , Rock wool panel are optional . If needed , normal pre-painted steel tile will be used for your project . |
Crane if needed | If needed , _____ units , max lifting weight ____ tons ; max lifting height _____ m |
Storage Cargo condition | If additional requirement for anti-corrosive |
2. Company In Brief:
We specializes in providing complete solutions for high-quality steel structure products including: design, fabrication and erection of. Besides pre-engineered buildings, nowadays, we have developed heavy structural industry and commercial projects that aim to provide customers full structures such as workshops, warehouses, plazas, exhibition centers, supermarkets, railway stations, airports and so on …
With a well-trained workforce of over 1, 000 professional staffs, quality management system ISO 9001:2008, ISO 14001: 2004, OHSAS 18001: 2007 and a 200, 000 m2 factory with high technology automatic production facilities, we delivers the optimal solution, high-quality products and perfect services for your project.
Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.
3. Project case- Russia Office Building, workshop and warehouse Project, 2012:
Detailed introduction
Project Scale: 3-floor heavy office building, 10ton crane in workshop and warehouse, total 3 buildings, tonnage 1240ton
Project scope: Construction drawings design, shop-drawing design, material procurement, steel structure fabrication and painting, and floor deck
4. Fabrication Services for Steel building ( made of frame structure ) :
With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.
5. Packing & Delivery for Steel building ( made of frame structure ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) How can I install these Steel building ( made of frame structure ) together as a building after cargo arrived ?
Normally, most clients choose to install the steel building structure frame themselves or ask local technical engineer for further instruction.
If local technical support is not available or cost too much, we could also provide technical support engineer cross over-seas for installation guide even with our installation engineering team.
2) How to maintain my Steel building ( made of frame structure ) years of using ?
Steel building ( made of frame structure ) are built for long-time, reliable, steady usage purpose, the maintenance process is easy to operate and complete, most our product can live 10-15 years with minimal maintenance work like gel filled and paint spray. We will keep tracking the usage performance of our products and provide maintenance instruction for our clients.