Min. Order: | 50 Metric Ton |
---|---|
Trade Term: | CFR |
Payment Terms: | L/C |
Supply Ability: | 9000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 2-092 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Software used: | AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures( Xsteel )V12.0.etc |
Service Offered: | Design, fabrication, packing, transport, erection |
Drawing Design: | by us |
Surface Treatment: | Gray paint, red paint, white paint, epoxy zinc etc. Or Galvanized |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Production Capacity: | 9000 Ton/per Month |
Packing: | Sandwich panels covered with plastic film |
Delivery Date: | 20 days |
1. Our excellent design team will design the Steel building ( made of structural steel works ) for you . If you give the following information:
1 ) Location ( where will be built ? ) _____ country , area
2 ) Size : Length * width * height _____ mm * _____ mm * _____ mm
3 ) wind load ( max . Wind speed ) _____ kn / m2 , _____ km / h , _____ m / s
4 ) snow load ( max . Snow height )
_____ kn / m2 , _____ mm
5 ) anti-earthquake _____ level
6 ) brick wall needed or not If yes , 1.2m high or 1.5m high
7 ) thermal insulation If yes , EPS, fiberglass wool , rock wool , PU sandwich panels will be suggested ; If not , the metal steel sheets will be ok . The cost of the latter will be much lower than that of the former .
8 ) door quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
9 ) window quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
10 ) crane needed or not If yes , _____ units , max . Lifting weight ____ tons ; Max . Lifting height ___m
2. We supply both common steel building and the special steel structure:
Besides structural steel building like workshop, warehouse, high rise building, Steel building ( made of structural steel works ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.
3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :
The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .
Main steel structure: welded H steel;
Purlin: cold-rolled C section steel;
Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.
4. Design & Engineering strength on Steel building ( made of structural steel works ) :
The engineering work in structural steel design includes in-depth analysis and design of the complete structure, in addition to the preparation of construction drawings and shop details.
1) We are an ISO 9001 certified company by UL Inc. USA, for design and manufacture of Pre-Engineered Steel Building Systems and Structures.
2) Our structural design team of 100 dedicated professionals and senior structural designers, is well equipped to work in accordance with all Chinese and international codes.
3) State-of-art technology is used for detailed design which is at par with international building design standards. All our steel buildings are designed using the most advanced metal building soft wares like Staad Pro, MBS, Tekla and others.
5. Packing & Delivery for Steel building ( made of structural steel works ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Q: How could I control the cost of building a Steel building ( made of structural steel works ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a Steel building ( made of structural steel works ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a Steel building ( made of structural steel works ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.