Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 9000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-175 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Service Offered: | bulk ship Shipment: 20'GP, 40'GP, 40'HQ, or in bulk |
Welding standard: | AWS D1.1 |
Design& quote: | We can make design and quotation according to your require or your drawing |
Main structure: | Welded H section,Lattice structure,Tubular column or beam,space frame etc |
Production Capacity: | 9000 Ton/per Month |
Packing: | Bolts and accessories loaded into wooden box |
Delivery Date: | 30 days |
1. Specifications of the Steel building ( made of Main frame steel structure ) :
Main steel frame : | H section steel beam and columns |
Secondary frame : | Galvanized C / Z purlin , steel bracing , tied bar , knee brace , edge cover etc . |
Roof & Wall panel : | Sandwich panel , corrugated steel sheet or skylight panel |
Tie Rod : | Circular Steel Tube |
Brace : | Round Bar |
Knee Brace : | Angle Steel |
Roof Gutter : | Color Steel Sheet or galvanized Steel sheet |
Rainspout : | PVC Pipe |
Door : | Swing door , sliding door or roller door |
Windows : | PVC steel or Aluminum Alloy Window |
Connecting : | Anchor bolt , high-strength bolt , common bolt |
Drawing : | We can make the design and quotation according to your requirement or your drawing |
Installation : | Provide full set of construction drawings and video to direct installation ; Engineer are able to stay at site to direct construction |
2. Company Brief:
Founded in Shandong, we are one of the most powerful enterprises of steel building and steel structure in China.
Area of Main factory: 360,000 square meters and the 200,000 square meters' workshops.
Total number of staff: 960 persons, details are as follow:
Number of Admin Staff: 140.
Number of Marketing and Sales: 102.
Number of Architectural Designers: 58
Number of In Line QC: 38.
Number of regular workers for production and installation of Steel building ( made of Main frame steel structure ) : 600
We have the experience to do the big projects with the top rank construction company in the world, we are always showing our best service and professionalism, and we have exported the steel structure buildings to more than 110 countries.
3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:
Main steel frame:
Steel beam & column: Q345, Welded H beam
Wind-resistant column: Q345, Welded H beam
Secondary frame:
Roof purlin: Z250*75*20*2.2
Ceiling purlin: C120*50*20*2.2
Wall purlin: C180*70*20*2
Tie bar: 102*2
Vertical & horizontal bracing: 20
Kneel-bracing: L504
Purlin bracing: Q235, 12
Sleeves tube: Q235, 32*2.5
Roof system:
Type V930 pu panel 0.5/100/0.6mm Pu panel
Wall system:
Type v930 panel 0.5/100/0.6mm Pu panel
This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.
4. Our quality system and welder certificates for Steel building ( made of Main frame steel structure ) :
From first day of our establishment, we concentrate on making the produce as per highest international quality standard.
Based on this concept, we continuously improve our quality system, and got international certificate as below:
Got AISC qualification and CWI welding inspection certificate as per American standard, have 163 American AWS welder.
Got EN1090 qualification, TWI welding inspection certificate and IWE welding engineer as per European standard, have 54 European standard welder.
In China, there are very few companies could own all such international certificates like us.
5. Our seaworthy packing system for Steel building ( made of Main frame steel structure ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Common type of the industrial building you supply ?
Portal frame is the usual type in the industrial workshop and warehouse shed, other types like lattice structure, space structure, etc also could be designed and manufacturer as per customers request.
2) What is the quality grade of the Steel building ( made of Main frame steel structure ) ?
Q345 is used for main steel structure, Q235 is used for secondary steel structure.
Also we could use international steel as per your demand if order qty is big enough.
3) How about the delivery time for your Steel building ( made of Main frame steel structure ) ?
Usually, within 30-45 days after the order confirmed, also depends on the fabrication quantity.