user login

steel frame structure and light steel structure new-designed to Warsaw market

1000.0 USD
Min. Order: 50 Metric Ton
Trade Term: CFR
Payment Terms: T/T
Supply Ability: 8000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-100
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Surface Treatment: painted with international paint painted with Hempel
Drawing Design: by client
Software used: American SAP2000 American STAAD-Pro, STAAD-Pro
Shipment by: Container
Production Capacity: 8000 Ton/per Month
Packing: Components will be packaged by steel pallet
Delivery Date: usually as customers'order
Show

Product Description



1. Our excellent design team will design the Steel building ( made of steel frame structure ) for you . If you give the following information:
1 ) Location ( where will be built ? ) _____ country , area
2 ) Size : Length * width * height _____ mm * _____ mm * _____ mm
3 ) wind load ( max . Wind speed ) _____ kn / m2 , _____ km / h , _____ m / s
4 ) snow load ( max . Snow height )
_____ kn / m2 , _____ mm
5 ) anti-earthquake _____ level
6 ) brick wall needed or not If yes , 1.2m high or 1.5m high
7 ) thermal insulation If yes , EPS, fiberglass wool , rock wool , PU sandwich panels will be suggested ; If not , the metal steel sheets will be ok . The cost of the latter will be much lower than that of the former .
8 ) door quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
9 ) window quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
10 ) crane needed or not If yes , _____ units , max . Lifting weight ____ tons ; Max . Lifting height ___m

 

2. Our Factory:

We were founded and located in Shandong Province, China. We have fixed assets of 180 million RMB and a workshop plant area of more than 200, 000 Square meters. Our manufacturing base covers 360, 000 square meters. In addition, we have more than 960 employees, including 110 intermediate and senior technical staff members. Besides, we have our own installation and construction teams. We also have abundant financial resources and advanced equipment, including H-TYPE and BOX-TYPE steel structure production lines, full-range impeller blasting equipment, production lines of rack and truss, C-TYPE and Z-TYPE steel forming machines, various kinds of machine tools, drilling machines, folding machines and physical and chemical detection equipment.

 

3. Project case- Hunan Volkswagen CAR ACCESSORY CO., LTD( 2013) :

This project includes the processing workshop( 12500 m2) , end products storage( 3600m2) , and a logistics center. The main processing is 12m high, with 48m span. All steel parts including steel main frame,  secondary frame and cladding system are manufactured and supplied by us.

 

4. How we ensure the high quality of Steel building ( made of steel frame structure ) :

After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:

1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.

2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .

3) Professional non-destructive testing, fully equipped.

4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.

5) More than 10 years steel structure fabrication experience

6) Full set of manufacturing process plan to ensure delivery on time.

 

5. Packaging & Shipping for Steel building ( made of steel frame structure ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Do you provide on-site installation service for Steel building ( made of steel frame structure ) ?

We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.

 

2) What' s your delivery time of your Steel building ( made of steel frame structure ) ?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

 


Post Buying Request