Min. Order: | 50 Metric Ton |
---|---|
Trade Term: | CFR |
Payment Terms: | L/C |
Supply Ability: | 3000 Ton/per Week |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-90 |
---|---|
Means of Transport: | Land |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Shipment by: | Container or bulk ship |
Design& quote: | We can make design and quotation according to your require or your drawing |
Specifications:: | Main Steel: Q345B, Q235B Column&Beam: Welded or Hot rolled H-section Wall&Roof: EPS, Rock wall, PU sandwich, corrugated |
Product Characteristics: | 1)Fine gloss exterior, anti-corrosive 2)High strength, satisfactory property of the steel 3)Anti-seismic, wind resistan |
Production Capacity: | 3000 Ton/per Week |
Packing: | Components will be packaged by steel pallet |
Delivery Date: | 15 to 40 days |
1. Fill the Table below and Sent It to Us, to Get Your Free Proposal for Steel building ( made of structural steel services ) :
Your location | Country ________ State ________ City _______ Postal code ________ |
Size | Length ________ meter Width ________ meter Height ________ meter |
Storey | Storey number ________ |
Wind Load | ________ km / hour |
Snow Load | ________ kn / m² |
Anti - earthquake | ________ magnitude |
Roof Normal Payload | ________ kg / m² |
Brick wall needed or not | If needed , brick height ________ |
Thermal insulation if needed | If needed , EPS panel , PU sandwich panel Glass wool panel , Rock wool panel are optional . If needed , normal pre-painted steel tile will be used for your project . |
Crane if needed | If needed , _____ units , max lifting weight ____ tons ; max lifting height _____ m |
Storage Cargo condition | If additional requirement for anti-corrosive |
2. About our company:
1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.
2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.
3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.
3. Project case- Argentina Steel Structure workshop Building:
We are the largest steel structure building materials supplier and manufacturer in Shandong, China.
This steel structure building used for workshop built in 2010 year for our Argentina Customer.
Project Conditions:
1) Size: 5930M2
Main workshop area 80m long* 60m wide* 9m Eaves height( ridge height 10m)
Affiliated workshop area: 1130 square meter.
2) Wall & roof material: V-960 light steel sandwich panel
3) Thermal Insulation: 50mm EPS foam, 12kg/ m3
4) Wind load: 0.79kn/ M2
5) Crane: 8 cranes( lifting capacity: 2 ton)
6) Windows and doors: electrical rolling window&doors, aluminium alloy
4. Payment Terms & Delivery for Steel building ( made of structural steel services ) :
Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)
Delivery time: 15 to 40 days, usually as customers' order
Shipment: 20' GP, 40' GP, 40' HQ, or in bulk
5. Packaging & Shipping for Steel building ( made of structural steel services ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) Why should I build steel building using steel structure ?
Steel has the higher strength.
80% recyclable, Steel is the most recycled material in the world.
No warping, no cracking, no chemical treatments.
Stronger connection.
Lower transport costs due to lightweight frames.
Steel frames will not burn, fire proof.
Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.
Each steel structure is a independent engineered.
2) How difficult is it to install Steel building ( made of structural steel services ) ?
Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.