user login

steel structure fabrication and steel structure fabrication hot sale in Rwanda

1000.0 USD
Min. Order: 50 Metric Ton
Trade Term: CIF
Payment Terms: L/C
Supply Ability: 10000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-67
Means of Transport: Land
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Quality Control: The third party, SGS, ASIA INSPECTION all accept
Installation: Engineer are able to stay at site to direct construction
Certificates:: 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE
Material Grade: European S235& S355 ASTM A36& A572
Production Capacity: 10000 Ton/per Month
Packing: Components will be packaged by steel pallet
Delivery Date: 15 to 40 days
Show

Product Description

1. How to build a Steel building ( made of steel structure fabrication ) , please check the following table :

Design Data ( important )

 live load on roof ( KN / M2 )  

 wind speed ( KM / H ) 

 snow load ( KG / M2 ) if have 

Size ( important )

 width

 length

 height 

 roof slope

Type

 single slope or double slope       

 muti slope or single span
 double-span or Multi-span        

 single floor  or two floors

Inter column

5m , or 6m ….

Windows & Door

1 . quantity   

2 . size  

3 . Location

4 . PVC or aluminum

Column &Beam

straight cross-section OR Variable cross-section

Roof & Wall Panel

1 . Colorful corrugated steel sheet  0.326~0.8mm thick , YX25-210-840 ( 840mm wide )
2 . sandwich panel with EPS , ROCK WOOL , PU etc , insulation thickness around 30 ~ 300mm 

3 . sheet+glass fiber(thick 50mm~200mm)

Purlin

1 . C purlin 

2 . Z purlin

Accessories

Do you need the skylight belts , Ventilators,down pipe , out gutter etc ?

Surface Treatment

Shot blasting with anti rust paint or hot dip galvanize

 

 

2. Why choose us:

1) Workshop covers an area of 200, 000 square meters;

2) Owning 10 professional production lines, annual output reaches 150, 000tons for all kinds of Steel building ( made of steel structure fabrication )

3) More than 80 senior & middle rank engineers; .

4) Products pass the approval of ISO9001, CE, ASME, CWI, SGS, BV etc;

5) Products have already exported to Philippines, Malaysia, Australia, the United States, Chile, the United Arab Emirates, Saudi Arabia, Russia, Niger etc more than 60 countries and regions.

 

3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :

 

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .

Main steel structure: welded H steel;

Purlin: cold-rolled C section steel;

Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.

 

4. Fabrication Services for Steel building ( made of steel structure fabrication ) :

With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.

 

5. Packaging & Shipping for Steel building ( made of steel structure fabrication ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Q: How could I control the cost of building a Steel building ( made of steel structure fabrication ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a Steel building ( made of steel structure fabrication ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a Steel building ( made of steel structure fabrication ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 


Post Buying Request