Min. Order: | 50 Metric Ton |
---|---|
Trade Term: | CIF |
Payment Terms: | L/C |
Supply Ability: | 3000 Ton/per Week |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-367 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Drawing Design: | by client or by us |
Software used: | STAAD-Pro RamConnection Midas/Gen |
Welding standard: | AWS D1.1 |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Certificates: | 1. ISO9000, ISO14000, ISO18000 by BV France. 2. EN-1090 CE certificate, American CWI, European TWI, European IWE |
Production Capacity: | 3000 Ton/per Week |
Packing: | Components will be packaged by steel pallet |
Delivery Date: | 15 to 40 days |
1. we can give you a quotation for the steel structure construction ( made of steel frame ) if you offer this :
A : Customers have the drawings we can provide you the accurate quotation and full service of production , shipment and installation guide , which is high quality and low cost . Because we own all kinds of technical facilities , complete test instruments and advanced production process . |
B : Without drawings Our excellent design team will freely design the light steel structure warehouse , workshop and other steel buildings for you . If you give the following information , we will give you the most satisfactory price and drawings . 1 . Dimension : Length , width , height etc . 2 . Doors and windows : Dimension , quantity , position . 3 . The material on the roof and the wall . 4 . Local climate : Wind speed , snow load , seismic load , temperature etc . 5 . If you have other requirements , please also inform us . |
2. Our products:
Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, steel structure construction ( made of steel frame ) ) .
We can also supply different kind of doors and windows, cranes which is related to project.
3. Project case- Qilu Petro-chemical Heavy Steel Workshop:
Size: 55000 square meter workshop, Single Span 39m, eave height 18m, mainly loading bear steel member over 100Ton, totally quantity of steel 6000Ton.
Steel Column: Q345B Four tube lattice column. Painted: 120um epoxy zinc painted.
Roof Structure: Q235B Pipe Truss Structure. Painted: 120um epoxy zinc painted.
Crane Beam: Q345B H section Steel Beam. Painted: 120um epoxy zinc painted.
Secondary Structure
Roof Horizontal Bracing: Q235B Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Wall X Cross Bracing: Q235B Double Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Tie Beam: Q235B Welding Pipe, Painted: three layer white color anti-rust Alkyd painted.
Roof Purlin: Galvanized C section steel
Wall Purlin: Galvanized C section steel
Steel Rod: Galvanized Steel Rod.
Panel system
Roof: 0.5mm Single Color sheet
Wall: 0.5mm Single Color sheet
4. Our technical team' s ability for steel structure construction ( made of steel frame ) :
1) We have 80 persons' design team with more than 20 years experience, who can provide the most reasonable proposal. We can offer AutoCAD proposal drawing according to your ideas, customer's drawing are welcomed. Clear span without middle column can reach to 30 meters.
2) 3D photos for pre-view how' s your building looks like is available.
3) Blueprint drawing is available.
4) Professional production drawing control excellent quality.
5) Very details installation drawing. Engineer on-site guidance is available
5. Our seaworthy packing system for steel structure construction ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Can I have a visit to your factory before the order ?
A: Why not ? welcome to visit our factory. You can fly to Jinan Airport. We will pick you up in the airport. Hotel booking service is available.
2) Do you supply installation service for steel structure construction ( made of steel frame ) ?
A: Yes, we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.
3) How long can the steel structure construction ( made of steel frame ) be used ?
A: The use life of the main structure is the designed used life, that is 50-100 years( standard request of GB) .