Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | CFR |
Payment Terms: | L/C |
Supply Ability: | 3000 Ton/per Week |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-600 |
---|---|
Means of Transport: | Land |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Surface Treatment: | Shot blasting then anti-rust paint or hot dip galvanize |
Shipment by: | bulk ship |
Main structure: | Welded H section,Lattice structure,Tubular column or beam,space frame etc |
Quality Control: | The third party, SGS, ASIA INSPECTION all accept |
Production Capacity: | 3000 Ton/per Week |
Packing: | Sandwich panels covered with plastic film |
Delivery Date: | 30 days |
1. Data of the pre engineering steel building ( made of steel frame ) :
Specification | |
Material : | Grade Q235 , equivalent to ASTM A36 Grade Q345 , equivalent to ASTM A572 |
Section : | Any product shape according to customer's requirements |
Certification : | ISO quality system , Chinese GB50221 - 2001 |
Sand Blast : | SA 2.5 Sand blasting |
Welding Technology : | Single level butt welding , fillet welding by electric arc welding , and Gas shielded welding |
Surface treatment : | Hot dip galvanized , Epoxy zinc rich primer Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02 |
Welding Testing | Ultrasonic Testing , X-ray Testing |
Manufacturing Technology | Drilling , Cutting , Assembling , Welding , Rectification , Testing etc |
2. Our products:
Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, pre engineering steel building ( made of steel frame ) ) .
We can also supply different kind of doors and windows, cranes which is related to project.
3. Project case- 10000 tons heavy steel structure for Indian cement plant Project:
Description:
The whole steel consumption of this is more than 10000 tons, Among which, the steel consumption of steel roofing truss for steel structure homogenization silo and structural steel bunker is about 7000 tons.
Raw materials silo, clinker materials silo, electricity dust removal, pre-heater and other structures, together with steel structure buildings for subsidiary equipment, total steel structure components reach approximately 3, 000 tons.
4. Our company' s design and quotation capability for pre engineering steel building ( made of steel frame ) :
1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.
2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.
3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.
5. Our seaworthy packing system for pre engineering steel building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How about the delivery time of the pre engineering steel building ( made of steel frame ) ?
Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.
2) What makes you different from other manufacturers ?
We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, pre engineering steel building ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.
3) Can I customize my pre engineering steel building ( made of steel frame ) ?
Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.