user login

pre engineering steel building made of frame steel 2017 latest well welded

1000.0 USD
Min. Order: 100 Metric Ton
Trade Term: CFR
Payment Terms: L/C
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-600
Means of Transport: Land
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Surface Treatment: Shot blasting then anti-rust paint or hot dip galvanize
Shipment by: bulk ship
Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc
Quality Control: The third party, SGS, ASIA INSPECTION all accept
Production Capacity: 3000 Ton/per Week
Packing: Sandwich panels covered with plastic film
Delivery Date: 30 days
Show

Product Description

1. Data of the pre engineering steel building ( made of steel frame ) :

Specification

Material :

Grade Q235 , equivalent to ASTM A36

Grade Q345 , equivalent to ASTM A572

Section :

Any product shape according to customer's requirements

Certification :

ISO quality system , Chinese GB50221 - 2001

Sand Blast :

SA 2.5 Sand blasting

Welding Technology :

Single level butt welding , fillet welding by electric arc welding , 

and Gas shielded welding

Surface treatment :

Hot dip galvanized , Epoxy zinc rich primer

Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02

Welding Testing

Ultrasonic Testing , X-ray Testing

Manufacturing Technology

Drilling , Cutting , Assembling , Welding , Rectification , Testing etc

 

 

2. Our products:

Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, pre engineering steel building ( made of steel frame ) ) .

We can also supply different kind of doors and windows, cranes which is related to project.

 

3. Project case- 10000 tons heavy steel structure for Indian cement plant Project:

Description:

The whole steel consumption of this is more than 10000 tons, Among which, the steel consumption of steel roofing truss for steel structure homogenization silo and structural steel bunker is about 7000 tons.

Raw materials silo, clinker materials silo, electricity dust removal, pre-heater and other structures, together with steel structure buildings for subsidiary equipment, total steel structure components reach approximately 3, 000 tons.

 

4. Our company' s design and quotation capability for pre engineering steel building ( made of steel frame ) :

1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.

2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.

3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.

 

5. Our seaworthy packing system for pre engineering steel building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How about the delivery time of the pre engineering steel building ( made of steel frame ) ?

Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.

 

2) What makes you different from other manufacturers ?

We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, pre engineering steel building ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.

 

3) Can I customize my pre engineering steel building ( made of steel frame ) ?

Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.

 

 


Post Buying Request