user login

commercial building made of light gauge metal low-cost export to San Jose

1000.0 USD
Min. Order: 120 Metric Ton
Trade Term: CFR
Payment Terms: L/C
Supply Ability: 9000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-888
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Shipment by: Container bulk ship
Welding standard: AWS D1.1
Design& quote: We can make design and quotation according to your require or your drawing
Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc
Production Capacity: 9000 Ton/per Month
Packing: Components will be packaged by steel pallet
Delivery Date: 30 days
Show

Product Description

1. Technical parameters for commercial building ( made of steel frame ) :

 Size

According to customer's requirements

Standard

GB , DIN , JIS , BS , ASTM

Material

Q235 ; Q345

Surface treatment

Painted with epoxy paint or zinc rich paint

Package

In bundle or pallet or according to the requirements of customers

Delivery

Container or Bulk

Shipment Time

According to the quantity and specification of each order

Production Usage

Used in industrial or civil fields

Product Characteristics

1 . Fine gloss exterior , anti-corrosive

2 . High strength , satisfactory property of the steel

3 . Anti-seismic , wind resistance , environmental protection

4 . Fire- resistant , clean and health

5 . 50-year-long life expectancy

 

Remark

Payment terms : T/T, L/C

Terms of trade

FOB , CFR , CIF , EXW

 

 

2. Wide Fields of Steel Structure be used:

1) Industrial steel structure warehouse, commercial building ( made of steel frame )

2) Steel workshop / hangar / garage

3) prefabricated steel structure shed, Exhibition Hall, Office buildings

4) Garage, Musty-story building, Agricultural storage

5) Logistic centers and all kinds of steel structure buildings etc

 

3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:

The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.

 

4. How we ensure the high quality of commercial building ( made of steel frame ) :

After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:

1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.

2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .

3) Professional non-destructive testing, fully equipped.

4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.

5) More than 10 years steel structure fabrication experience

6) Full set of manufacturing process plan to ensure delivery on time.

 

5. Our seaworthy packing system for commercial building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How to buy your ideal commercial building ( made of steel frame ) ?

A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.

 

2) What is the delivery time of commercial building ( made of steel frame ) ?

A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.

 

3) How to install after the goods arriving destination ?

A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.  

 

4) Q: Does your steel building can only be used in residential building ?

A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.

 

 


Post Buying Request