user login

Industrial Building and prefabricated industrial buildings with good design

1000.0 USD
Min. Order: 50 Metric Ton
Trade Term: CFR
Payment Terms: L/C, T/T
Supply Ability: 8000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-846
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Design& quote: We can make design and quotation according to your require or your drawing
Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc
Specifications:: Wall&Roof: EPS, Rock wall, PU sandwich, corrugated steel sheet
Product Characteristics: 2)High strength, satisfactory property of the steel 3)Anti-seismic, wind resistance, environmental protection
Production Capacity: 8000 Ton/per Month
Packing: Components will be packaged by steel pallet
Delivery Date: 15 to 40 days
Show

Product Description

1. How to build a Industrial Building ( made of steel frame ) , please check the following table :

Design Data ( important )

 live load on roof ( KN / M2 )  

 wind speed ( KM / H ) 

 snow load ( KG / M2 ) if have 

Size ( important )

 width

 length

 height 

 roof slope

Type

 single slope or double slope       

 muti slope or single span
 double-span or Multi-span        

 single floor  or two floors

Inter column

5m , or 6m ….

Windows & Door

1 . quantity   

2 . size  

3 . Location

4 . PVC or aluminum

Column &Beam

straight cross-section OR Variable cross-section

Roof & Wall Panel

1 . Colorful corrugated steel sheet  0.326~0.8mm thick , YX25-210-840 ( 840mm wide )
2 . sandwich panel with EPS , ROCK WOOL , PU etc , insulation thickness around 30 ~ 300mm 

3 . sheet+glass fiber(thick 50mm~200mm)

Purlin

1 . C purlin 

2 . Z purlin

Accessories

Do you need the skylight belts , Ventilators,down pipe , out gutter etc ?

Surface Treatment

Shot blasting with anti rust paint or hot dip galvanize

 

 

2. About us:

Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, Industrial Building ( made of steel frame ) etc to all kinds of pre-engineered buildings.

Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.

 

We are also a certified green building partner and all our products comply with international green norms.

 

3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :

 

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .

Main steel structure: welded H steel;

Purlin: cold-rolled C section steel;

Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.

 

4. Fabrication Services for Industrial Building ( made of steel frame ) :

With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.

 

5. Our seaworthy packing system for Industrial Building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Are you manufacturer or trader ?

We are manufacturer. Welcome to visit us at any time!

 

2) How can you avoid size error in supplying us the Industrial Building ( made of steel frame ) ?

We select international size error standards;

Use specified equipment to cut shear and rectify steel plate according to steel thickness;

Standard weld and installation order to lessen deformation.

 

3) What is the cost if we ask your engineers to assemble ?

Round-trip air tickets, eating, living, translation fee, visa fee and salary.

Our team include senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.

 


Post Buying Request