user login

metal fabrication factory and steel frame industrial buildings rust proof

1000.0 USD
Min. Order: 120 Metric Ton
Trade Term: CFR
Payment Terms: L/C
Supply Ability: 8000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-839
Means of Transport: Land
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Installation: Engineer are able to stay at site to direct construction.
Certificates:: EN-1090 CE certificate, American CWI, European TWI, European IWE
Material Grade: Grade Q235, equivalent to ASTM A36 Grade Q345, equivalent to ASTM A572
Standard: European code ASTM standard CE certification
Production Capacity: 8000 Ton/per Month
Packing: sea worthy packing
Delivery Date: 30 days
Show

Product Description

1. Product Details for metal fabrication factory ( made of steel frame ) :

Main frame

1

Main steel structure

 

( columns and beams )

1 . Steel Q345 ( S355JR ) or Q235 ( S235JR ) H shape

2 . Straight cross-section or Variable cross - section

2

Sub steel structure

1 . Material Q235 ( S235JR ) steel

2 . Bolt connections . Anti-rust painted or galvanized .

3 . Bracing :X - type or V - type or other type bracing made from angle , round pipe , etc

4 . Purlins : C or Z type : Size from C120 ~ C320 , Z100 ~ Z200

Maintenance system

3

Roof

Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile

4

Wall

Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile


Doors

Steel rolling shutter or others


Windows

Alu. Alloy window , or others

Fitting

7

Edge Cover

Steel sheet 0.5mm thickness

8

Bolts

M24 , M22 , M16 embedded bolts , intensive bolts , galvanized ordinary bolts , high-strength bolts , etc

9

Others options

Day - lighting panel , Roof ventilator , Down pipe , Galvanized , Crane , sanitary Products , etc

10

Foundation

Cement and steel foundation bolts

 

 

2. Why Our metal fabrication factory ( made of steel frame ) is your Right Choice:

1) Stable and deep financial capacity

Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

2) Competitive Prices

Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

3) Fast Quotations

Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.

4) Fast Delivery

We are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).

5) Site Supervision

A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.

 

3. Project case- Industry Prefabricated Steel building:

Argentina prefabricated steel workshop project was done in the year of 2013, finished installation in the year of 2014. Total area of this workshop is 5, 700 square meters. Main workshop size is 84X 60X 9m, totally 4 spans, 15m per span with one 3ton crane in each, lifting height of the crane is 6m. Two accessory houses on both sides of the main workshop.

 

4. Our Manufacturing Capability for metal fabrication factory ( made of steel frame ) :

With annual production capacity pf 200, 000 tons, we have established a large steel structure production base which applied advances professional equipment, leading craftwork and technology, and proceeds professionalized, growing-scales steel structure manufacturing. By introducing the world first rate steel structure professional production lines, the company owns advanced professional production equipment for the all automation production line of H type that is most advanced at home, pipe truss structure, box beam production lines etc. Therefore, it can accomplish various processing tasks of light steel, heavy steel, space structure steel component products in high quality and in time. With the gigantic processing and manufacturing demand in the steel structure of project construction, but can also provide steel structure processing service based on the demand of customers.

 

5. Our seaworthy packing system for metal fabrication factory ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Do you provide on-site installation service for metal fabrication factory ( made of steel frame ) ?

We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.

 

2) What' s your delivery time of your metal fabrication factory ( made of steel frame ) ?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

 


Post Buying Request