Min. Order: | 50 Metric Ton |
---|---|
Trade Term: | CFR |
Payment Terms: | T/T |
Supply Ability: | 10000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-13 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Welding standard: | AWS D1.1 |
Surface Treatment: | painted with PPG |
Drawing Design: | by client or by us |
Software used: | American SAP2000 American STAAD-Pro |
Production Capacity: | 10000 Ton/per Month |
Packing: | Components will be packaged by steel pallet |
Delivery Date: | 15 to 40 days |
Main Grade : Q345B , Q235B
Standard : ISO9001 : 2008
We are a Factory-direct provider of all kinds of steel structure buildings and material plant . We specialize in design , fabricate construction , install and related technology guide . Our competitive price and high quality have got customers from all over the word .
Applications :
Used as Steel workshop / warehouse / shed , Exhibition Hall , Office buildings , Garage , Multi-story building , Hanger , Agricultural storage , Logistic centers , and all kinds of steel materials etc .
Specifications :
Main Steel : Q345B , Q235B
Column&Beam : Welded or Hot rolled H-section
Wall&Roof : EPS , Rock wall , PU sandwich , corrugated steel sheet
Door : Rolled up door or Sliding door
Window : Plastic steel or Aluminum alloy window
Surface : Hot dip galvanized or painted . ( all colors we can do )
Crane : 5T , 10T , 15T , etc .
2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, Steel building ( made of heavy steel ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
3. Project case- Russia Office Building, workshop and warehouse Project, 2012:
Detailed introduction
Project Scale: 3-floor heavy office building, 10ton crane in workshop and warehouse, total 3 buildings, tonnage 1240ton
Project scope: Construction drawings design, shop-drawing design, material procurement, steel structure fabrication and painting, and floor deck
4. Certification for Steel building ( made of heavy steel ) :
We are always committed to the development of steel structure. By far we have achieved the following certificates:
CE EN1090 certification
Quality Management System Certification ISO9001: 2008, by BV France
Environment Management System Certification ISO14001: 2004, by BV France
Occupational Health and Safety Management System Certification, by BV France
CWI certificate
TWI certificate
ASME certificate
AWS welder certificate etc.
5. Packaging & Shipping for Steel building ( made of heavy steel ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of Steel building ( made of heavy steel ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the Steel building ( made of heavy steel ) ?
40% advance payment by T/ T, the balance before delivery.