Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 3000 Ton/per Week |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-789 |
---|---|
Means of Transport: | Land |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Product Characteristics: | 1)Fine gloss exterior, anti-corrosive 2)High strength, satisfactory property of the steel |
Installation: | Engineer are able to stay at site to direct construction. |
Certificates:: | 1. ISO9000, ISO14000, ISO18000 by BV France. |
Material Grade: | ASTM A36& A572 JIS SS400 |
Production Capacity: | 3000 Ton/per Week |
Packing: | Bolts and accessories loaded into wooden box |
Delivery Date: | 20 days |
1. How to build a steel workshop buildings ( made of steel frame ) , please check the following table :
Design Data ( important ) | live load on roof ( KN / M2 ) wind speed ( KM / H ) snow load ( KG / M2 ) if have |
Size ( important ) | width length height roof slope |
Type | single slope or double slope muti slope or single span single floor or two floors |
Inter column | 5m , or 6m …. |
Windows & Door | 1 . quantity 2 . size 3 . Location 4 . PVC or aluminum |
Column &Beam | straight cross-section OR Variable cross-section |
Roof & Wall Panel | 1 . Colorful corrugated steel sheet 0.326~0.8mm thick , YX25-210-840 ( 840mm wide ) 3 . sheet+glass fiber(thick 50mm~200mm) |
Purlin | 1 . C purlin 2 . Z purlin |
Accessories | Do you need the skylight belts , Ventilators,down pipe , out gutter etc ? |
Surface Treatment | Shot blasting with anti rust paint or hot dip galvanize |
2. We supply both common steel building and the special steel structure:
Besides structural steel building like workshop, warehouse, high rise building, steel workshop buildings ( made of steel frame ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.
3. Project case- warehouse construction for Brazil Hidu logistics Park, 2014, 19, 200SQM:
Warehouse size is 160m length* 120m width* 15m height. Because the schedule is very tight, the contractor require to be completed within one month. Our company try our best to only use 25 days finish the project. Get government and Hidu Group highly praise.
Technical specification:
1) Column spacing: 6 m
2) Steel column: Q345, H500 * 200 * 10 * 12( GB)
3) Steel beam: Q345, H( 300-600) * 200 * 8 * 12( GB)
4) Roof purlin: C160 * 60 * 20 * 2.3( GB)
5) Wall purlin: C160 * 60 * 20 * 2.3( GB)
6) Column bracing: 25 steel round
7) Horizontal bracing: 25 steel round
8) Gutter water system: 3mm steel sheet, 160 PVC downpipe
9) Roof panel( outside): V-760, 0.5mm single board+ 75mm fiberglass+ aluminum foil
10) Wall panel: V-820, 0.5mm single board
11) Components paint: main structure sprayed 3 times, secondary frame for 2 times with iron red acrylic anti-rust paint and a medium gray alkyd primer
The client hired the SGS as the 3rd party QC, all WPS and QAP are adopting the highest international standard. We perfectly finish this project and won the trust of the client. Client told us, this is the real win-win business. Because we help them win the trust and profit from the owner due to our quick delivery with best quality.
4. Certificates & Quality Management for the steel workshop buildings ( made of steel frame ) :
We have ISO9000, 14000, 18000 by BV France, AWS& EN welder, CE etc to ensure our whole production progress controllable.
We also have systematic Quality Process and Progress Control documentation: Our fabrication process have been controlled by series of documentation and quality testing which are monitored and certificated by BV, SGS, SKM, JACOBES etc world-famous third party inspection organization.
5. Our seaworthy packing system for steel workshop buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) What kind of company you are ?
We are steel structure building Manufacturer located in Shandong China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.
2) Does your company is a factory or trade company ?
We are factory, so you will enjoy the best price and competitive price. The price of steel workshop buildings ( made of steel frame ) is composed of the quotation for steel structure, wall and roof panel. It has absolute price advantage for its low manpower cost, short building period and low requirement on building site even the material cost is high in comparison to the building with the traditional material.