Min. Order: | 100 Metric Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T |
Supply Ability: | 10000 Ton/per Month |
Place of Origin: | Shandong |
Location: | Binzhou, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Service |
Model No.: | 1-469 |
---|---|
Means of Transport: | Ocean |
Brand Name: | HX |
Top client Serviced: | SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil |
Surface Treatment: | painted with PPG painted with international paint |
Drawing Design: | dwgs Detailing by us |
Product Characteristics: | 1)Fine gloss exterior, anti-corrosive 2)High strength, satisfactory property of the steel 3)Anti-seismic, wind resistanc |
Quality Control: | The third party, SGS, ASIA INSPECTION all accept |
Production Capacity: | 10000 Ton/per Month |
Packing: | sea worthy packing |
Delivery Date: | 15 to 40 days |
1. Information for a frame building ( made of steel frame ) :
Standard | ASTM , BS , DIN , GB , JIS |
Material Grade | Q235 & Q345 ( S235JR & S355JR ) |
Dimensions | Yours requirements |
Place Of Origin | Shandong China ( Mainland ) |
FOB Price | US $ 20 - 150 / Square Meter |
Port | Qingdao |
Minimum Order Quantity | 100SQM |
Supply Ability | 1000 Ton / Tons per Month |
Payment Terms | L/C ,T/T |
Quality Control | The third party , SG S , ASIA INSPECTION all accept |
Delivery Term | Within 20 days after signing contract |
Packaging | According yours requirement , usually bundle with steel strip |
Delivery Container | 20'GP , 40'GP , 40'HQ , 40'OT |
Our Experience | Have exported for 13 years , clients from all over the world |
2. Our products:
Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, a frame building ( made of steel frame ) ) .
We can also supply different kind of doors and windows, cranes which is related to project.
3. Project case- Heavy Steel Structure Building in Qingdao, 60, 000 SQM:
The Project - metallurgical automatic transmission equipment assembly base steel structure project. Located in Qingdao China High-tech Zone, total span is 120 meters, total length is 198.1 meters; eave height is 13.2 meters; the ridge height is 18.6 meters.
1) Trims,flashing: color steel sheet;
2) Gutter: color steel sheet;
3) Downpipe: PVC;
4) Door: sandwich panel door;
5) Window: Aluminium window( single glass)
This project is the national important investment project, the government, 3rd party QC consultant and the owner track the quality and progress very strictly in the whole process, finally they are satisfied with our quality and performance, and issue 5% extra bonus for our one month advance delivery which save them too much cost and make their production beginning earlier.
4. Our technical team' s ability for a frame building ( made of steel frame ) :
1) We have 80 persons' design team with more than 20 years experience, who can provide the most reasonable proposal. We can offer AutoCAD proposal drawing according to your ideas, customer's drawing are welcomed. Clear span without middle column can reach to 30 meters.
2) 3D photos for pre-view how' s your building looks like is available.
3) Blueprint drawing is available.
4) Professional production drawing control excellent quality.
5) Very details installation drawing. Engineer on-site guidance is available
5. Our seaworthy packing system for a frame building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Are you manufacturer or trader ?
We are manufacturer. Welcome to visit us at any time!
2) How can you avoid size error in supplying us the a frame building ( made of steel frame ) ?
We select international size error standards;
Use specified equipment to cut shear and rectify steel plate according to steel thickness;
Standard weld and installation order to lessen deformation.
3) What is the cost if we ask your engineers to assemble ?
Round-trip air tickets, eating, living, translation fee, visa fee and salary.
Our team include senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.