user login

steel warehouse construction and Prefab steel warehouse on sale export to Oman

1000.0 USD
Min. Order: 50 Metric Ton
Trade Term: CFR
Payment Terms: T/T
Supply Ability: 8000 Ton/per Month
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-785
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Shipment by: Container or bulk ship Container
Welding standard: AWS D1.1
Design& quote: We can make design and quotation according to your require or your drawing
Main structure: Welded H section,Lattice structure,Tubular column or beam,space frame etc
Production Capacity: 8000 Ton/per Month
Packing: sea worthy packing
Delivery Date: 30 days
Show

Product Description

1. Products description for the steel warehouse construction ( made of steel frame ) :

Main Steel

Steel Beam Column

Q235B , Q345B

Secondary Steel

Tie Bar

Q235B

Purlin

C and Z purlin

Bracing

Q235B

Accessories

Surface

Painted or Hot Dip Galvanized

Door

Rolling Up Door or Sliding Door

Window

PVC or Aluminum Alloy

Roof and Wall Panels

Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich 

Panel , PU Sandwich Panel

Others

Service

Design , Fabrication and Installation

We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings .

Design software :  Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc

Packing

main steel frame with 40 OT 

roof and panel load in 40 HQ 

Or According To Customer Requirement

 

 

2. Applications of steel structure:

Structural steel fabrication have become increasingly and widely used at the workshops, warehouse, steel warehouse construction ( made of steel frame ) and other industrial and civil architectures. For example, single-span and multi-span gantry light-frame structures, exhibition Hall, industrial steel frame, Office buildings, Garage, Multy-story building, Hanger, Agricultural storage, Logistic centers, and all kinds of steel construction, etc.

 

3. Project case- warehouse construction for Brazil Hidu logistics Park, 2014, 19, 200SQM:

 

Warehouse size is 160m length* 120m width* 15m height. Because the schedule is very tight, the contractor require to be completed within one month. Our company try our best to only use 25 days finish the project. Get government and Hidu Group highly praise.

Technical specification:

1) Column spacing: 6 m

2) Steel column: Q345, H500 * 200 * 10 * 12( GB)

3) Steel beam: Q345, H( 300-600) * 200 * 8 * 12( GB)

4) Roof purlin: C160 * 60 * 20 * 2.3( GB)

5) Wall purlin: C160 * 60 * 20 * 2.3( GB)

6) Column bracing: 25 steel round

7) Horizontal bracing:  25 steel round

8) Gutter water system: 3mm steel sheet, 160 PVC downpipe

9) Roof panel( outside): V-760, 0.5mm single board+ 75mm fiberglass+ aluminum foil

10) Wall panel: V-820, 0.5mm single board

11) Components paint: main structure sprayed 3 times, secondary frame for 2 times with iron red acrylic anti-rust paint and a medium gray alkyd primer

 

The client hired the SGS as the 3rd party QC, all WPS and QAP are adopting the highest international standard. We perfectly finish this project and won the trust of the client. Client told us, this is the real win-win business. Because we help them win the trust and profit from the owner due to our quick delivery with best quality.

 

4. Certification for steel warehouse construction ( made of steel frame ) :

We are always committed to the development of steel structure. By far we have achieved the following certificates:

CE EN1090 certification

Quality Management System Certification ISO9001: 2008, by BV France

Environment Management System Certification ISO14001: 2004, by BV France

Occupational Health and Safety Management System Certification, by BV France

CWI certificate

TWI certificate

ASME certificate

AWS welder certificate etc.

 

5. Our seaworthy packing system for steel warehouse construction ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How long is your delivery time for steel warehouse construction ( made of steel frame ) ?

A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of steel warehouse construction ( made of steel frame ).

 

2) Q: What is the colors of your sandwich panels usually used ?

A: Off-white, ivory white, blue, green and red color.

 

3) Q: How can I get the quotation of the project ?

A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.

 

 


Post Buying Request