user login

prefabricated building components made of sistema steel frame wind resistance

1000.0 USD
Min. Order: 150 Metric Ton
Trade Term: FOB
Payment Terms: L/C
Supply Ability: 3000 Ton/per Week
Place of Origin: Shandong

Company Profile

Location: Binzhou, Shandong, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: 1-618
Means of Transport: Ocean
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Surface Treatment: painted with Hempel painted with JOTUN
Welding standard: AWS D1.1
Material Grade: European S235& S355 ASTM A36& A572
Standard: ASTM standard CE certification CE
Production Capacity: 3000 Ton/per Week
Packing: Sandwich panels covered with plastic film
Delivery Date: 15 to 40 days
Show

Product Description



1. Characteristics for the prefabricated building components ( made of steel frame ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. Our business and products scope:

Our company is dedicated to steel framed buildings, from research, design, manufacture, installation and after-sales service. We mainly provide a comprehensive range of steel structure products, including multi-storey high-rise buildings( for commercial offices, hotels, residents, etc.), light steel structure system( for warehouse, workshop, supermarket etc.) and the wide-span steel structure system( for airport, exhibition center, stadium, etc. ) , prefabricated building components ( made of steel frame ) etc. Additionally, service of technology consult is available.

 

3. Overseas projects we undertook in the last few years:

Industrial Warehouse(13000 m2)― Argentina

Warehouse(14000m2) , Republic of Uzbekistan

Workshop(12000m2) , Canada

Warehouse(3600m2) , Romania

Vegetable Market(2500m2) , Mauritius

Pig shed(3500m2) , USA

Chicken shed(2800m2) , Australia

Aircraft Hangar(1300m2) , Australia

Warehouse(900m2) , Mongolia

Prefabricated house(70m2) , 800 sets , Angola

Container house(20' ) , 60 sets , South Africa

 

4. We can provide shop and installation drawing for prefabricated building components ( made of steel frame ) :

1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.

2) We produce according to the process drawing and make delivery according to the shipping list.

3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.

 

5. Our seaworthy packing system for prefabricated building components ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How about the delivery time of the prefabricated building components ( made of steel frame ) ?

Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.

 

2) What makes you different from other manufacturers ?

We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, prefabricated building components ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.

 

3) Can I customize my prefabricated building components ( made of steel frame ) ?

Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.

 

 


Post Buying Request